On the Compact Vector Summation in Stochastic Machine Scheduling

نویسندگان

  • A. V. Kononov
  • B. M. T. Lin
  • Bertrand M. T. Lin
  • R. A. Koryakin
  • S. V. Sevastyanov
چکیده

Given a fixed budget, the generic relocation problem seeks to determine a feasible reconstruction sequence of old buildings for a public housing project. The feasibility issue can be resolved because it is mathematically equivalent to makespan minimization in a two-machine flowshop. In this paper, we consider the variant where multiple working crews are available for the redevelopment project. Most of our results center on the unitexecution time (UET) situations. In this case the relocation problem is a generalization of the classical bin packing problem and can be considered as a special resource-constrained scheduling problem. We first present an NP-hardness proof for a case with two working crews and unit processing times that has remained open since 1988. Then, we design several approximation algorithms and obtain non-approximability results for different cases of relocation problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

Study of Scheduling Problems with Machine Availability Constraint

In real world scheduling applications, machines might not be available during certain time periods due to deterministic or stochastic causes. In this article, the machine scheduling with availability constraints for both deterministic and stochastic cases with different environments, constraints and performance measures will be discussed. The existing body of research work in the literature wil...

متن کامل

Stochastic extension of cellular manufacturing systems: a queuing-based analysis

Clustering parts and machines into part families and machine cells is a major decision in the design of cellular manufacturing systems which is defined as cell formation. This paper presents a non-linear mixed integer programming model to design cellular manufacturing systems which assumes that the arrival rate of parts into cells and machine service rate are stochastic parameters and descri...

متن کامل

Real-time Scheduling of a Flexible Manufacturing System using a Two-phase Machine Learning Algorithm

The static and analytic scheduling approach is very difficult to follow and is not always applicable in real-time. Most of the scheduling algorithms are designed to be established in offline environment. However, we are challenged with three characteristics in real cases: First, problem data of jobs are not known in advance. Second, most of the shop’s parameters tend to be stochastic. Third, th...

متن کامل

A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times

This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005