Supply chain planning models with general backorder penalties, supply and demand uncertainty, and quantity discounts

نویسنده

  • Aly Megahed
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...

متن کامل

Development of a novel lot sizing model with variable lead time in supply chain environment

Supply chain management (SCM) addresses the management of materials and information across the entire chain from suppliers to producers, distributors, retailers, and customer. The theory of supply chain management suggests that lead time reduction is a pioneer to the use of market mediation to reduce transaction uncertainty in the chain, which can be conceptualized as the primary goal of supply...

متن کامل

A Fuzzy Based Mathematical Model for Vendor Selection and Procurement Planning with Multiple Discounts in the Presence of Supply Uncertainty

Supplier selection and material procurement planning are the most important issues in supply chain management. This decision is complicated when the buyers face with discount price schemes. In real situation, each supplier may apply different methods such as different types of discount schedules and various types of payment in order to increase market share. In this situation, buyers try to sel...

متن کامل

A joint pricing-network design model for a resilient closed-loop supply chain under quantity discount

In this paper, a novel resilient multi-echelon closed-loop location-allocation-inventory problem (RMCLIP) is addressed that optimizes strategic and tactical decisions simultaneously. In order to represent the purchasing cost of raw material from the supplier, a pricing model under quantity discounts is employed in the closed-loop supply chain (CLSC). Considering the capability of returning the ...

متن کامل

EPQ model with scrap and backordering under Vendor managed inventory policy

This paper presents the economic production quantity (EPQ) models for the imperfect quality items produced with/without the presence of shortage condition. The models are presented in a two-level supply chain composed of a single manufacturer and a single buyer to investigate the performance of vendormanaged inventory (VMI) policy. The total costs are minimized to obtain the optimal production ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015