A selection hyper-heuristic for scheduling deliveries of ready-mixed concrete

نویسندگان

  • Mustafa Misir
  • Wim Vancroonenburg
  • Katja Verbeeck
  • Greet Vanden Berghe
چکیده

The existence of several solution strategies for different search and optimisation problems motivates the use of these strategies in a collaborative way. These collaborative approaches are considered in the context of hybridisation. Hyper-heuristics provide hybridisation by performing search on multiple low-level heuristics for finding efficient solutions in a problem-independent manner. In this study, a suite of simple moves is employed to solve real world instances of the ready-mixed concrete delivery problem. These basic moves are used under a selection hyper-heuristic that makes use of the new adaptive iteration limited list-based threshold accepting with a fixed limit and four others for comparison. These hyper-heuristics are tested on a set of real world ready-mixed concrete delivery problem instances and a performance analysis is carried out.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimizing of ready-mixed concrete vehicle scheduling problem by hybrid heuristic algorithm

RMC (Ready-mixed concrete) vehicle scheduling problem is a complex combinatorial optimization problem with intersection of several research areas, such as logistics, just-in-time production and supply chains etc. We integrates RMC production scheduling and vehicle dispatch problems in the same framework by network flow techniques and establishes a mixed integer programming model for ready-mixed...

متن کامل

A Hybrid Solution Approach for Ready-Mixed Concrete Delivery

Companies in the concrete industry are facing the following scheduling problem on a daily basis: concrete produced at several plants has to be delivered at customers’ construction sites using a heterogeneous fleet of vehicles in a timely, but cost-effective manner. As the ordered quantity of concrete typically exceeds the capacity of a single vehicle several deliveries need to be scheduled in o...

متن کامل

The concrete delivery problem

From an operational point of view, Ready-Mixed Concrete Suppliers are faced with challenging operational problems such as the acquisition of raw materials, scheduling of production facilities, and the transportation of concrete. This paper is centered around the logistical and distributional part of the operation: the scheduling and routing of concrete, commonly known as the Concrete Delivery P...

متن کامل

Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete

The coordination of just-in-time production and transportation in a network of partially independent facilities to guarantee timely delivery to distributed customers is one of the most challenging aspect of supply chain management. From a theoretical perspective, the timely production/distribution can be viewed as a hybrid combination of planning, scheduling and routing problem, each notoriousl...

متن کامل

A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem

In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery.  jobs have to be scheduled on a single machine and delivered to  customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011