Iterative algorithms for the curfew planning problem

نویسندگان

  • Suat Bog
  • Ashish K. Nemani
  • Ravindra K. Ahuja
چکیده

The curfew planning problem is to design an annual timetable for railway track maintenance teams. Each team is capable of handling certain types of repairs and replacement jobs. The jobs are combined into a set of projects according to their locations and types. The timetable shows which project should be worked on by each team on a weekly basis throughout an entire year. Our objective is to design a schedule with minimum network disruption due to ongoing maintenance projects that require absolute curfew. Absolute curfew projects are those that cause complete closure of the rail traffic. For tackling this problem, we develop four optimization-based iterative algorithms. We also present very promising computational results obtained within a few minutes using data provided by a major North American railroad. Journal of the Operational Research Society (2011) 62, 593–607. doi:10.1057/jors.2010.1 Published online 10 March 2010

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Strong convergence theorem for solving split equality fixed point problem which does not involve the prior knowledge of operator norms

‎Our contribution in this paper is to propose an iterative algorithm which does not require prior knowledge of operator norm and prove a strong convergence theorem for approximating a solution of split equality fixed point problem for quasi-nonexpansive mappings in a real Hilbert space‎. ‎So many have used algorithms involving the operator norm for solving split equality fixed point problem‎, ‎...

متن کامل

Meta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain

In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...

متن کامل

Network Planning Using Iterative Improvement Methods and Heuristic Techniques

The problem of minimum-cost expansion of power transmission network is formulated as a genetic algorithm with the cost of new lines and security constraints and Kirchhoff’s Law at each bus bar included. A genetic algorithm (GA) is a search or optimization algorithm based on the mechanics of natural selection and genetics. An applied example is presented. The results from a set of tests carried ...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...