Chia - Nan Wang Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing

نویسنده

  • Chia-Nan Wang
چکیده

The more accurate the forecast is to lot delivery time, the more effective it is in fab scheduling. In fab operations, scheduling is the major impact factor of tools capacity allocation, tools utilization control and bottleneck management. However, there is no effective method to estimate delivery time in 300 mm automatic material handling systems (AMHS) operation. Computer simulations are authentic, but they are either too complex to model fab operations as well as the whole AMHS, or too time-consuming to simulate with a full-scaled fab model. This paper proposes an analytic methodology to estimate the loopto-loop delivery time for differentiated lots in a 300 mm AMHS environment. Combining simulation and statistics techniques, we develop a modularized simulation method (MSM) for delivery time forecast of priority lots. Numerical experiments based on data from a local 300 mm manufacturing fab are conducted. Simulation demonstrates that the MSM has credible results in estimating lot delivery times. The time differences between MSM and simulation for both priority lots and regular lots are 0.2 s and 0.1 s, respectively. Using the MSM method to forecast AMHS delivery time is a great contribution for streamlining shop floor operations, such as scheduling and dispatching, for eliminating time delays in the 300 mm automatic environment.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories

The integrated circuit (IC) manufacturing industry is one of the biggest output industries in this century. The 300mm wafer fabs is the major fab size of this industry. The automatic material handling system (AMHS) has become one of the most concerned issues among semiconductor manufacturers. The major lot delivery of 300mm fabs is used overhead hoist transport (OHT). The traffic jams are happe...

متن کامل

An Improved Dispatching Method (a-HPDB) for Automated Material Handling System with Active Rolling Belt for 450 mm Wafer Fabrication

The semiconductor industry is facing the transition from 300 mm to 450 mm wafer fabrication. Due to the increased size and weight, 450 mm wafers will pose unprecedented challenges on semiconductor wafer fabrication. To better handle and transport 450 mm wafers, an advanced Automated Material Handling System (AMHS) is definitely required. Though conveyor-based AMHS is expected to be suitable for...

متن کامل

The Improvement of Lot Delivery Time in 450 mm Semiconductor Manufacturing

Semiconductor industry has tremendous development in recent decades. According to Moore’s Law [1], semiconductor wafer manufacturers have to search improvement opportunities constantly in order to be competitive. International technology roadmap for semiconductor [2] has indicated the possible scenarios for 450 mm wafer fabs, and the conveyor will be a potential solution to realize transportati...

متن کامل

Simulation study for a proposed segmented automated material handling system design for 300-mm semiconductor fabs

With the increase in the size and weight of 300-mm wafers, the factory area must be enlarged accordingly. Due to the flow of material over long distances, the elimination of manual wafer handling has become necessary. Consequently, an automated material handling system (AMHS) is required for 300-mm semiconductor manufacturing facilities. The design of an AMHS must not only be capable of meeting...

متن کامل

Simulation Based Comparison of Semiconductor Amhs Alternatives: Continuous Flow vs. Overhead Monorail

Automation is an essential component in today’s semiconductor manufacturing As factories migrate to 300 mm technology, automated handling becomes increasingly important for variety of ergonomic, safety, and yield considerations. Traditional semiconductor AMHS systems, such as the Overhead Monorail Vehicles (OMV) or Overhead Hoist, can be overly expensive. Cost projections for a 300mm inter/intr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005