High-volume, multistage continuous production flow through a re-entrant factory is modeled through a conservation law for a continuous-density variable on a continuous-production line augmented by a state equation for the speed of the production along the production line. The resulting nonlinear, nonlocal hyperbolic conservation law allows fast and accurate simulations. Little’s law is built into the model. It is argued that the state equation for a re-entrant factory should be nonlinear. Comparisons of simulations of the partial differential equation (PDE) model and discrete-event simulations are presented. A general analysis of the model shows that for any nonlinear state equation there exist two steady states of production below a critical start rate: A high-volume, high-throughput time state and a low-volume, low-throughput time state. The stability of the low-volume state is proved. Output is controlled by adjusting the start rate to a changed demand rate. Two linear factories and a re-entrant factory, each one modeled by a hyperbolic conservation law, are linked to provide proof of concept for efficient supply chain simulations. Instantaneous density and flux through the supply chain as well as work in progress (WIP) and output as a function of time are presented. Extensions to include multiple product flows and preference rules for products and dispatch rules for re-entrant choices are discussed.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II

In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization of the production rate and the other is the minimization of processing time. The system has m stations and can process several products in a moment. The re-entrant flow sho...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Modeling and Analysis of Material Flows in Re-Entrant Supply Chain Networks Using Modified Partial Differential Equations

The basic partial differential equation PDE models for supply chain networks with re-entrant nodes and their macroscopic are proposed. However, through numerical examples, the basic continuummodels do not performwell for multiple re-entrant systems. Then, a new state equation considering the re-entrant degree of the products is introduced to improve the effectiveness of the basic continuum mode...

متن کامل

Modeling of a Probabilistic Re-Entrant Line Bounded by Limited Operation Utilization Time

This paper presents an analytical model based on mean value analysis (MVA) technique for a probabilistic re-entrant line. The objective is to develop a solution method to determine the total cycle time of a Reflow Screening (RS) operation in a semiconductor assembly plant. The uniqueness of this operation is that it has to be borrowed from another department in order to perform the production s...

متن کامل

Solving Re-entrant No-wait Flow Shop Scheduling Problem

In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Operations Research

دوره 54  شماره 

صفحات  -

تاریخ انتشار 2006