Control of an Assembly System with Processing Time and Subassembly-Type Uncertainty
نویسندگان
چکیده
We address the problem of controlling an assembly system in which the processing times as well as the types of subassemblies are stochastic. The quality (or performance) of the final part depends on the characteristics of the subassemblies to be assembled, which are not constant. Furthermore, the processing time of a subassembly is random. We analyze the trade-off between the increase in the potential value of parts gained by delaying the assembly operation and the inventory costs caused by this delay. We also consider the effects of processing time uncertainty. Our problem is motivated by the assembly of passive and active plates in flat panel display manufacturing. We formulate the optimal control problem as a Markov decision process. However, the optimal policy is very complex, and we therefore develop simple heuristic policies. We report the results of a simulation study that tests the performance of our heuristics. The computational results indicate that the heuristics are effective for a wide variety of cases.
منابع مشابه
A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کاملMulti-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)
In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...
متن کاملمساله کنترل مدت زمان ساخت چند هدفه استوار در سیستمهای مونتاژ پیچیده
In this paper, a robust multi-objective model to optimally control the lead time of a complex assembly system is introduced. The system is modeled as an open queue network, whose service stations represent manufacturing or assembly operations. It is assumed that the products arrive independently according to a Poisson process. In each service station, there is either one or infinite number of...
متن کاملMixed-Model Assembly Line Balancing with Considering Reliability
This paper presents a multi-objective simulated annealing algorithm for the mixed-model assembly line balancing with stochastic processing times. Since, the stochastic task times may have effects on the bottlenecks of a system, maximizing the weighted line efficiency (equivalent to the minimizing the number of station), minimizing the weighted smoothness index and maximizing the system reliabil...
متن کاملMulti-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization
Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...