Schedule execution for two-machine flow-shop with interval processing times

نویسندگان

  • Natalja M. Matsveichuk
  • Yuri N. Sotskov
  • Natalja G. Egorova
  • T.-C. Lai
چکیده

This paper addresses the issue of how to best execute the schedule in a two-phase scheduling decision framework by considering a two-machine flow-shop scheduling problem in which each uncertain processing time of a job on a machine may take any value between a lower and upper bound. The scheduling objective is to minimize the makespan. There are two phases in the scheduling process: the off-line phase (the schedule planning phase) and the on-line phase (the schedule execution phase). The information of the lower and upper bound for each uncertain processing time is available at the beginning of the offline phase while the local information on the realization (the actual value) of each uncertain processing time is available once the corresponding operation (of a job on a machine) is completed. In the off-line phase, a scheduler prepares a minimal set of dominant schedules, which is derived based on a set of sufficient conditions for schedule domination that we develop in this paper. This set of dominant schedules enables a scheduler to quickly make an on-line scheduling decision whenever additional local information on realization of an uncertain processing time is available. This set of dominant schedules can also optimally cover all feasible realizations of the uncertain processing times in the sense that for any feasible realizations of the uncertain processing times there exists at least one schedule in this dominant set which is optimal. Our approach enables a scheduler to best execute a schedule and may end up with executing the schedule optimally in many instances according to our extensive computational experiments which are based on randomly generated data up to 1000 jobs. The algorithm for testing the set of sufficient conditions of schedule domination is not only theoretically appealing (i.e., polynomial in the number of jobs) but also empirically fast, as our extensive computational experiments indicate. © 2008 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times

This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...

متن کامل

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

Fuzzy Multi-objective Permutation Flow Shop Scheduling Problem with Fuzzy Processing Times under Learning and Aging Effects

In industries machine maintenance is used in order to avoid untimely machine fails as well as to improve production effectiveness. This research regards a permutation flow shop scheduling problem with aging and learning effects considering maintenance process. In this study, it is assumed that each machine may be subject to at most one maintenance activity during the planning horizon. The objec...

متن کامل

A New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study

This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation  for new scenarios. Thus, a two-stage predictive algorithm is prop...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Mathematical and Computer Modelling

دوره 49  شماره 

صفحات  -

تاریخ انتشار 2009