A Comprehensive Optimization Model Based on Time and Cost Constraints for Resource Selection in Data Grid

نویسندگان

  • Mingcheng Qu
  • Xiang-hu Wu
  • Xiao-Zong Yang
چکیده

Parallel data transmission based on multi-copy can enhance transmission speed and ensure the QoS of data grid greatly. The status of network and replica node, the distance of replica node, the time and bandwidth of service requester will directly affect service cost. How to take the above factors into account, so as to provide basis for node selection and bandwidth allocation, guarantee the time constraint of service requestor and optimize service cost is a key problem need to be solved urgently. Based on ‘0-1’ integer programming and linear programming methods, respectively, a minimum transfer time model, minimum cost model and comprehensive optimization model are proposed to solve the above problem. Simulative experiments show that the models are correct and effective.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

A Multi Objective Optimization Approach for Resources Procurement of Bank

Calculating total cast of bank resources procurement methods which include current -free loan deposit, saving interest-free loan deposit, regular and net short-term investment deposit, long-term investment deposit and surety bond cash deposit and presenting their optimal integration require precise scientific studies. Hence, this study is an attempt to know which methods are the best optimal in...

متن کامل

A Model for Project Selecting with Limited Resources in Data Envelopment Analysis with Input and Output Fuzzy

In Evaluating Performance, Selecting a Subset from a Set of Solutions with Limited Resources is Essential. If There Is More Than One Input and Output, the Data Rnvelopment Analysis Optimization Models Are Evaluated and Performance Measurement Based on the Weighted Output Is Divided Weighted Input. In This Research, Two Models of Optimization with Limited Resources Present from Data Envelopment ...

متن کامل

A Comprehensive Model for R and D Project Portfolio Selection with Zero-One Linear Goal-Programming (RESEARCH NOTE)

Technology centered organizations must be able to identify promising new products or process improvements at an early stage so that the necessary resources can be allocated to those activities. It is essential to invest in targeted research and development (R and D) projects as opposed to a wide range of ideas so that resources can be focused on successful outcomes. The selection of the most ap...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • JSW

دوره 6  شماره 

صفحات  -

تاریخ انتشار 2011