Purpose In an extended research program, started about two decades ago, a number of models have been developed for monitoring and controlling construction. These include models for the control of materials, earthmoving equipment, guardrail installation and labor. All these models convert data on the actual project performance that is obtained through Automated Data Collection (ADC) technologies, into information that can be compared with the project plan. Tests that were conducted with these models indicate that the use of ADC can substantially improve project control, but that in the areas that were studied manually obtained data is required as well, due to the limitations of existing ADC technologies, and due to the complexity and unpredictability of human actions. The proposed paper will discuss how manually and automatically collected data can be combined for project monitoring and control. Method In addition to ADC, manual data is currently required to support project monitoring – i.e., the identification of deviations from the planned performance that will likely lead to significant problems in the project. For example, tests show that in order to obtain information on the actual duration of activities, a manual recording of their completion time is required in addition to the automated tracking of workers. This can be facilitated through the use of data taken from a computerized daily site report. These data are transformed by a progress monitoring model into information regarding the actual progress, and then transferred to scheduling software. Project control involves taking the measures necessary to correct or minimize significant deviations. However, it is often difficult to automatically identify the actual impact these measures might have on the project. To facilitate project control, a graph-based model that can be used to identify the project elements affected by proposed measures, is expanded to include data that is manually added by users. This data includes tacit knowledge regarding existing buffers in the project, and decisions by project team members on the way in which measures will be implemented. Results & Discussion Different methods can be used for the integration of data from manual and automated sources. A model that uses the daily site report for project monitoring was implemented in a computerized prototype and tested in a construction project. Another model, that combines a graph-based representation of the project with manual data from project team members for project control, was tested in simulations with experts. The results of these tests were positive, and demonstrated the usefulness of the proposed approach.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sensitometric characteristics of D-, E- and F-speed dental radiographic films in manual and automatic processing

BACKGROUND: The purpose of this study was to evaluate the sensitometric characteristics of Ultraspeed, Ektaspeed Plus and Insight dental radiographic films using manual and automatic processing systems. METHODS: In this experimental invitro study, an aluminum step-wedge was used to construct characteristic curves for D-, E- and F-speed radiographic films (Kodak Eastman, Rochester, USA). All fil...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

Validation of Synoptic Station Data Using Ensemble Classification on Central Iran

Today, the use of data recorded in synoptic stations of the country is one of the most significant sources of applied research for researchers. Data recorded automatically or manually at synoptic, climatological, and other stations are analyzed for statistical analysis. In this research, the data recorded in the synoptic stations of Iran, which are used to determine the days of dust, were analy...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

Combining pattern recognition and deep-learning-based algorithms to automatically detect commercial quadcopters using audio signals (Research Article)

Commercial quadcopters with many private, commercial, and public sector applications are a rapidly advancing technology. Currently, there is no guarantee to facilitate the safe operation of these devices in the community. Three different automatic commercial quadcopters identification methods are presented in this paper. Among these three techniques, two are based on deep neural networks in whi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012