Algorithms for Minimizing Maximum Lateness with Unit Length Tasks and Resource Constraints
نویسندگان
چکیده
Blazewicz, J., W. Kubiak and S. Martello, Algorithms for minimizing maximum lateness with unit length tasks and resource constraints, Discrete Applied Mathematics 42 (1993) 1233138. The problem we consider is that of scheduling n unit length tasks on identical processors in the presence of additional scarce resources. The objective is to minimize maximum lateness. It has been known for some time that the problem is NP-hard even for two processors and one resource type. In the present paper we show that the problem can be solved in O(n log n) time, even for an arbitrary number of resources if the instance of the problem has the saturation property (i.e., no resource unit is idle in an optimal schedule). For the more general problem without saturation, two heuristic algorithms and a branch and bound approach are proposed. The results of computational tests of the above methods are also reported.
منابع مشابه
Scheduling interval orders with release dates and deadlines
We study the problem of scheduling unit-length tasks with release dates and deadlines subject to precedence constraints and unit communication delays. Two polynomial-time algorithms are de ned: one constructs schedules for graphs with uniform release dates, the other for graphs with arbitrary release dates. They have a special structure: unlike most scheduling algorithms, they do not consider i...
متن کاملCycle Time Reduction and Runtime Rebalancing by Reallocating Dependent Tasks
Business Process Management Systems (BPMS) is a complex information system that provides designing, administrating, and improving the business processes. Task allocation to human resources is one of the most important issues which should be managed more efficiently in BPMS. Task allocation algorithms are defined in order to meet the various policies of organizations. The most important of these...
متن کاملScheduling multiprocessor tasks on two parallel processors
In this work scheduling multiprocessor tasks on two parallel identical processors is considered. Multiprocessor tasks can be executed by more than one processor at the same moment of time. We analyze scheduling unit execution time and preemptable tasks to minimize schedule length and maximum lateness. Cases with ready times, due-dates and precedence constraints are discussed.
متن کاملScheduling UET task systems with concurrency on two parallel identical processors
Problems with unit execution time (UET) tasks and two identical parallel processors have received a great deal of attention in scheduling theory. In contrast to the conventional models, where each task requires only one processor, we consider a situation when a task may require both processors simultaneously. Following Lloyd, we term such task systems systems with concurrency. For problems with...
متن کاملSolving Single Machine Sequencing to Minimize Maximum Lateness Problem Using Mixed Integer Programming
Despite existing various integer programming for sequencing problems, there is not enoughinformation about practical values of the models. This paper considers the problem of minimizing maximumlateness with release dates and presents four different mixed integer programming (MIP) models to solve thisproblem. These models have been formulated for the classical single machine problem, namely sequ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Discrete Applied Mathematics
دوره 42 شماره
صفحات -
تاریخ انتشار 1993