Minimizing Makespan and Workstation Utilization in a Flowshop with Operations Flexibility

نویسندگان

  • Alex J. Ruiz-Torres
  • Johnny C. Ho
  • Jose H. Ablanedo-Rosas
چکیده

Operations flexibility refers to production environments where there are more tasks than workstations and any task can be assigned to any workstation. This article investigates the advantages of operations flexibility in a flowshop when the objectives are to minimize the makespan and workstation utilization. The proposed heuristic framework consists of two phases, allocation of operations to workstations and generation of job sequencing. Moreover, an improvement procedure based on simulated annealing is implemented for this problem. Experiments are conducted to: analyze the impact of operations flexibility; demonstrate that schedules that are makespan optimal may not be machine utilization optimal and vice versa; and analyze the performance of the proposed heuristics.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

Two-machine flowshop scheduling with flexible operations and controllable processing times

TWO-MACHINE FLOWSHOP SCHEDULING WITH FLEXIBLE OPERATIONS AND CONTROLLABLE PROCESSING TIMES Zeynep Uruk M.S. in Industrial Engineering Advisor: Prof. Dr. Selim Aktürk Co-Advisor: Asst. Prof. Dr. Hakan Gültekin August, 2011 In this study, we consider a two-machine flowshop scheduling problem with identical jobs. Each of these jobs has three operations, where the first operation must be performed ...

متن کامل

Minimizing makespan in flowshop with time lags

We consider the problem of minimizing the makespan in a flowshop involving maximal and minimal time lags, denoted by Fm|θ, θ|Cmax. Time lag constraints generalize the classical precedence constraints between operations: minimal (respectively maximal) time lags indeed specify that the time elapsed between two operations must be lower(respectively upper-) bounded. We assume that such constraints ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011