A Bayesian model to assess rail track geometry degradation through its life-cycle
نویسندگان
چکیده
One of the major drawbacks in rail track investments is the high level of uncertainty in maintenance, renewal and unavailability costs for the Infrastructure Managers (IM) during the life-cycle of the infrastructure. Above all, rail track geometry degradation is responsible for the greatest part of railway infrastructure maintenance costs. Some approaches have been tried to control the uncertainty associated with rail track geometry degradation at the design stage, though little progress has improved the investors’ confidence. Moreover, many studies on rail track life-cycle cost modelling tend to forget the dynamic perspective in uncertainty assessments and do not quantify the expected reduction of the uncertainty associated with degradation parameters as more inspection data is collected after operation starts. In this paper, a Bayesian model to assess rail track geometry degradation is put forward, building up a framework to update the uncertainty in rail track geometry degradation throughout its life-cycle. Using inspection data from Lisbon-Oporto line, prior probability distributions are fitted to the model parameters quantifying the associated uncertainty at the design stage, and then they are sequentially updated as more inspection data becomes available when operation starts. Uncertainty reduction in geometry degradation parameters is then assessed by computing their posterior probability distributions each time an inspection takes place. Finally, the results show that at the design stage, the uncertainty associated with degradation rates is very high, but it reduces drastically as more inspection data is collected. Significant impacts on the definition of maintenance cost allocation inside railway business models are discussed, especially for the case of Public and Private Partnerships. Moreover, potential impacts of this methodology in maintenance contracts are highlighted. For the case of a new infrastructure, it is proposed that maintenance costs assessments related to track geometry degradation are no longer assessed at the design stage based only on the prior probability distributions of the degradation model parameters, but renegotiated instead after a ‘warm-up’ period of operation based on their posterior probability distributions. 2012 Elsevier Ltd. All rights reserved.
منابع مشابه
A Bayesian model for rail track geometry degradation: a decisive step towards the assessment of uncertainty in rail track life-cycle
متن کامل
Influences of Track Structure, Geometry and Traffic Parameters on Railway Deterioration
The roles of the several parameters that influences railway track deterioration most, are examined in this research with a view to make railway track maintenance more effective and cost efficient. The results presented are based on a comprehensive study of railway track degradation on super structure, sub-structure and geometrical aspects. The changes in TQI (Track Quality Index), the track set...
متن کاملPARAMETRIC STUDY ON RAILWAY FASTENING SYSTEM RESPONSE SUBJECTED TO DIFFERENT AXLE LOAD
There are several factors causing fastening systems to deteriorate faster than the designed life. The high repetitive loads from a moving train being one of the main factors, track irregularities, design and installation defects of track components, non-uniform rail support stiffness, unevenness in the rail seat deterioration are some of the factors causing fastenings systems to deteriorate fas...
متن کاملStatistical modelling of railway track geometry degradation using Hierarchical Bayesian models
Railway maintenance planners require a predictive model that can assess the railway track geometry degradation. The present paper uses a hierarchical Bayesian model as a tool to model the main two quality indicators related to railway track geometry degradation: the standard deviation of longitudinal level defects and the standard deviation of horizontal alignment defects. Hierarchical Bayesian...
متن کاملRemarks on Modern Track Geometry Maintenance
A short survey on modern track maintenance methods is given, concentrating on the developments in recent years. The ongoing refinement of the machinery should be shown as the influence of IT-solutions. On top the economic view to the track infrastructure is briefly demonstrated. Further developments in track hardware solutions must respect the obtained high level of track work mechanization. H...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2015