TIPSTER-Compatible Projects at Sheffield

نویسندگان

  • Hamish Cunningham
  • Kevin Humphreys
  • Robert J. Gaizauskas
  • Yorick Wilks
چکیده

Projects currently underway at Sheffield may be more appropriately described by the term Language Engineering than the well-established labels of Natural Language Processing or Computational Linguistics. This reflects an increased focus on viable applications of language technology, promoting a view of the software infrastructure as central to the development process. To this end, Sheffield has produced GATE a TIPSTER-compatible General Architecture for Text Engineering providing an environment in which a number of Sheffield projects are currently being developed.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

FOCUS OF TIPSTER PHASES I and II

The TIPSTER Program began in June 1989 just after the conclusion of the second Message Understanding Conference (MUC-2). The concept which the Advanced Research Projects Agency (ARPA) put forward at that time was based on the promising results of that conference and on the belief that the technologies being demonstrated at MUC for the automated handling oflarge volumes of text would be of great...

متن کامل

The NYU TIPSTER II Project

Dr. Ralph Grishman steered the Architecture Working Group, and led its subset, the Contractors' Architecture Working Group (CAWG), in the development of the Architecture Design and the implementation of that design in the two Architecture demonstrations, the first shown at the TIPSTER Phase II 6-Month Workshop in November 1994, and the second at the 12-Month Workshop in May 1995. He continues t...

متن کامل

TIPSTER Phase III Goals

The primary goal of TIPSTER Phase III is to promote advancements in text processing technologies. To accomplish this goal, the TIPSTER Program will continue to encourage the cooperation of researchers and developers in government, industry and academia to achieve a balanced overall program. The Phase III framework is modeled on that of Phase II and will consist of four basic components: (1) Adv...

متن کامل

The Lockheed Martin TIPSTER II Project

The Lockheed Martin TIPSTER II project focused on several research areas. In addition, three demonstration projects are underway to exhibit the feasibility of transitioning the research into an operational setting. in text together with a set of tools for easily constructing recognizers for new objects. In addition, the group has advanced the state of the art for identifying co-referential noun...

متن کامل

The Text Retrieval Conferences (trecs)

Phase III of the TIPSTER project included three workshops for evaluating document detection (information retrieval) projects: the fifth, sixth and seventh Text REtrieval Conferences (TRECs). This work was co-sponsored by the National Institute of Standards and Technology (NIST), and included evaluation not only of the TIPSTER contractors, but also of many information retrieval groups outside of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1996