Reliability Assessment and Optimization under Uncertainty in the Dempster-Shafer Framework
نویسندگان
چکیده
Epistemic uncertainty has been a subject heavily discussed in recent years. Where uncertainty of estimations for long time has been disregarded, it is now viewed as an inherent property of the system model. This work demonstrates how different data types like expert estimations and manufacturer’s data with various degrees of epistemic uncertainty are acquired and aggregated in a coherent framework. Using this model we show how to improve reliability using multi-objective optimization. A Pareto-based evolutionary algorithm is applied to find a choice of nondominated solutions. A new strategy for biasing the search to desired objectives without loosing diversity is presented. The user can select a posteriori between solutions covering a wide range of the objective space but clustering in the specified area.
منابع مشابه
Project Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملA novel risk-based analysis for the production system under epistemic uncertainty
Risk analysis of production system, while the actual and appropriate data is not available, will cause wrong system parameters prediction and wrong decision making. In uncertainty condition, there are no appropriate measures for decision making. In epistemic uncertainty, we are confronted by the lack of data. Therefore, in calculating the system risk, we encounter vagueness that we have to use ...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملمحاسبه فاصله عدم قطعیت بر پایه آنتروپی شانون و تئوری دمپستر-شافر از شواهد
Abstract Dempster Shafer theory is the most important method of reviewing uncertainty for information system. This theory as introduced by Dempster using the concept of upper and lower probabilities extended later by Shafer. Another important application of entropy as a basic concept in the information theory can be used as a uncertainty measurement of the system in specific situation In th...
متن کاملRanking the factors affecting the care and provision of health services to patients in medical centers using the VIKOR dempster-shafer method: a brief report
Background: Determining the rank of important parameters in ranking health care and providing health services to patients in medical centers. Methods: The research method is descriptive-analytical and applied in terms of classification. The data is from the database of the Faculty of Health and Medicine of the University of Tehran, which was collected as an archive from April 1998 to May 1999....
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2004