We consider the problem of scheduling n jobs on m identical parallel machines. An optimal schedule to the proposed problem is defined as one that gives the smallest makespan (the completion time of the last job on any one of the parallel machines) among the set of all schedules with optimal total flowtime (the sum of the completion times of all jobs). We propose two new simple heuristic algorithms and empirically compare their effectiveness and efficiency with several existing algorithms.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing Flowtime Subject to Optimal Makespan on Two Identical Parallel Machines

We consider the problem of scheduling jobs on two parallel identical machines where an optimal schedule is defined as one that gives the smallest total flowtime (the sum of the completion time of all jobs) among the set of schedules with optimal makespan (the completion time of the latest job). Utilizing an existing optimization algorithm for the minimization of makespan, we propose an algorith...

متن کامل

Makespan minimization of multi-slot just-in-time scheduling on single and parallel machines

The paper addresses the problem of multi-slot just-in-time scheduling. Unlike the existing literature on this subject, it studies a more general criteria – the minimization of schedule makespan rather than the minimization of the number of slots used by schedule. It gives an O(n log n)-time optimization algorithm for the single machine problem. For arbitrary number of m > 1 identical parallel m...

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

Minimizing Maximum Flow-time on Related Machines

We consider the online problem of minimizing the maximum flow-time on related machines. This is a natural generalization of the extensively studied makespan minimization problem to the setting where jobs arrive over time. Interestingly, natural algorithms such as Greedy or Slow-fit that work for the simpler identical machines case or for makespan minimization on related machines, are not O(1)-c...

متن کامل

A New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines

Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004