Resource Scheduling with Supply Constraint and Linear Cost
نویسندگان
چکیده
Parallel resource and machine scheduling received a lot of attentions in the literature. In most of parallel scheduling models, the numbers of resources or machines that jobs must be assigned at each time unit are the inputs of the problems, i.e., jobs cannot be assigned to arbitrary numbers of resources or machines at the same time unit. In this paper, we consider the following scheduling problem. There are m resources available at each time unit, and n jobs, each requiring a number of resources. A resource can only be assigned to one job at each time unit while jobs can get arbitrary numbers of resources at the same time unit. The objective is to find a schedule that minimizes the total weighted completion time. We show this problem is NP-hard when the number of resource available at each time unit is the input of the problem. We then give a simple greedy algorithm to achieve 2-approximation. Finally, we present a dynamic programming algorithm to solve this problem when the number of different resources requirements is a constant.
منابع مشابه
AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کاملMulti-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization
Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...
متن کاملOptimization of an energy based bi-objective multi skilled resource investment project scheduling problem
Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...
متن کاملA New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملOptimization model for resource assignment problems of linear construction projects
For linear construction projects, it has long been known that resource utilization is i]mportant in improving work efficiency. However, most existing scheduling techniques cannot satisfy the need for solving such issues. This study presents a flexible model for resolving linear scheduling problems involving different objectives and resource assignment tasks. The proposed model adopts constraint...
متن کاملCoordinated resource scheduling in a large scale virtual power plant considering demand response and energy storages
Virtual power plant (VPP) is an effective approach to aggregate distributed generation resources under a central control. This paper introduces a mixed-integer linear programming model for optimal scheduling of the internal resources of a large scale VPP in order to maximize its profit. The proposed model studies the effect of a demand response (DR) program on the scheduling of the VPP. The pro...