Reward Systems and Incentives in a Project Based Organisation Identification of Reward Systems and Incentives influencing Construction Site Managers Master of Science Thesis in the Master’s Programme International Project Management

نویسنده

  • TOBIAS ERIKSSON
چکیده

Aim – This study sets out to identify and investigate how rewards, reward systems and organisational incentives influence construction site managers in a project based organisation. Method – The research was designed as a case study within one district in Skanska Sweden AB. The main data source in was approximately 10 semi-structured interviews conducted with managers at Skanska. Questions aimed to identify rewards related to the organisational context of the construction site managers. Findings – Construction site manager rewards were identified to stem from the project environment, the company, social relationships, the job position and the individual personal values. Moreover a number of incentives and reward systems affecting the provision of site manager rewards were identified, among which the manager were identified to have the largest impact. Furthermore, results are discussed and related to common problems related in project based organisations. Conclusions – The paper provides insights in how construction site managers perceive their work context from a reward perspective.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...

متن کامل

Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)

Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Improvement of project management office performance: An empirical investigation of effective factors in iranian construction industry

Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performa...

متن کامل

Flexible resource management and its effect on project cost and duration

In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012