Development of a Multigap-Pseudospark Switch for the PFN of the SIS100/300 Kicker Magnet Pulse Generator

نویسندگان

  • I. Petzenhauser
  • K. Frank
  • B. J. Lee
  • U. Blell
چکیده

In Erlangen multigap Pseudospark switches are under development to meet the requirements of the pulse forming network (PFN) for the SIS100/300 kicker magnets which are: hold-off voltage > 70 kV, peak current of ~ 6 kA and pulse duration of up to 6 μs. In the final phase of development a three-gap switch will be used. As reliable triggering is a key problem, different trigger methods were investigated to provide reliable breakdown of the switch acceptable delay and jitter values. A novel scheme, the carbon nanotube trigger system provided very good switching characteristics, but still suffers from very low lifetime (< 10) due to erosion in the ambient gas atmosphere (D2 ~60 Pa) in the switch. A quite different and already widely tested system of the so-called highdielectric trigger module was significantly improved by using thicker dielectric discs (6 mm instead of 1 mm) and new materials. Such a high-dielectric trigger module with a flat and partly metallized electrode (e.g. by a grid or “ metal fingers”), and a dielectric in between is shown in Figure 1. “finger” contact “plate” contact high-dielectric material

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Impedance of the Pulse Power Converter for the Sis100 Bipolar Extraction Kicker System

SIS100 will be operated with high intensity heavy-ion and proton beams. In order to avoid coherent beam instabilities, the reduction of the overall ring impedance is of great importance. The extraction kicker system is one of the main contributors to the overall ring impedance. This paper focuses on the contribution of the external electrical network to the kicker impedance. Previous calculatio...

متن کامل

Pseudospark Switch Development for the LHC Extraction Kicker Pulse Generator

CERN, the European Laboratory for Particle Physics, has started construction of the Large Hadron Collider (LHC), a superconducting accelerator that will collide protons at a center of mass energy of 14 TeV from the year 2005 onwards. The kicker magnet pulse generators of the LHC beam extraction system require fast high power switches. One possible type is the pseudospark switch (PSS) which has ...

متن کامل

High Voltage Measurements on a Prototype Pfn for the Lhc Injection Kickers

Two LHC injection kicker magnet systems must produce a kick of 1.3 T.m each with a flattop duration of 4.25 μs or 6.5 μs, a rise time of 900 ns, and a fall time of 3 μs. The ripple in the field must be less than ±0.5%. The electrical circuit of the complete system has been simulated with PSpice[3]. The model includes a 66 kV resonant charging power supply (RCPS), a 5 Ω pulse forming network (PF...

متن کامل

Research and Development of Rhic Injection Kicker Upgrade with Nano Second Fid Pulse Generator*

Our recent effort to test a 50 kV, 1 kA, 50 ns pulse width, 10 ns pulse rise time FID pulse generator with a 250 ft transmission cable, resistive load, and existing RHIC injection kicker magnet has produced unparalleled results. This is the very first attempt to drive a high strength fast kicker magnet with a nano second high pulsed power (50 MVA) generator for large accelerator and colliders. ...

متن کامل

Test Set-up of a Bipolar SIS100 Kickersystem

Since bipolar kicker systems with a similar electrical configuration have so far not been realized elsewhere, a potential cross-talk between the two Thyratrons switches must be experimentally investigated. The pulse will be generated at a large distance from the kicker magnet and is transported to the kicker by means of a transformer, for potential detachment, and a transmission line. Therefore...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007