The complexity of biosorption treatments for oxyanions in a multi-element mine effluent.

نویسندگان

  • Charlotte L Johansson
  • Nicholas A Paul
  • Rocky de Nys
  • David A Roberts
چکیده

Selenium (Se) is a contaminant in effluents from coal mines and coal-fired power stations, where it is encountered as the oxyanion selenate (SeO4(2-), hereafter Se(VI)). Se(VI) can be removed from solution with Fe-treated biosorbents, but the efficacy of these treatments in effluents with multiple contaminants is unclear. This study investigates the interactions between Se(VI) and the oxyanions SO4(2-) and NO3(-). We produce a sustainable biosorbent, Gracilaria Modified Biochar (GMB), by treating a waste product generated after the commercial extraction of agar from cultivated seaweeds with ferric chloride (FeCl3) and converting it to biochar through pyrolysis. We then test interactions between Se(VI) and competing oxyanions in mock solutions and a real-world mine effluent with high concentrations of SO4(2-) and NO3(-). GMB immediately removed 98% of the Se(VI) from the mock solution, but only 3% from the mine effluent with the same initial Se(VI) concentration. Notably, 83-89% of the Se(VI) was removed by GMB when concentrations of Se(VI) and SO4(2-) were less than or equimolar in mock solutions. Higher concentrations of SO4(2-) reduced the uptake of Se(VI). There was no interference from NO3(-) on the biosorption of Se(VI). GMB is a successful biosorbent for Se(VI), however, high concentrations of SO4(2-) will compromise the biosorption of Se(VI).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effects of pH and biomass concentrations in the removal of selenite from acid mine drainage by Aspergillus niger as biosorbent in Sarcheshmeh porphyry copper mine

The biosorption process of a lypophilised cell suspension of Aspergillus niger was studied for selenite ( − 2 3 SeO ) removal from acid mine drainage in the Sarcheshmeh porphyry copper mine. The biomass was first characterised by the potentiometric titration, and the major ionic content was evaluated. The experimental data suggest that the biomass cell wall contains two main acidic groups with ...

متن کامل

Bio-Remediation of Acid Mine Drainage in the Sarcheshmeh Porphyry Copper Mine by Fungi: Batch and Fixed Bed Process

Acid mine drainage (AMD) containing high concentrations of iron and sulphate, low pH and variableconcentrations of heavy metals leads to many environmental problems. The concentrations of Cu and Mnare high in the AMD of the Sarcheshmeh porphyry copper mine, Kerman province, south of Iran. In thisstudy, the bio-remediation of Cu and Mn ions from acid mine drainage was investigated using two nati...

متن کامل

UPL determination of multi-element deposits with grade uncertainty using a new block economic value calculation approach

The block economic value (BEV) of a single-metal deposit is calculated based on the metal content and the related costs. The common methods available for calculating BEV are just based upon the profitable elements, and the effects of undesirable elements on BEV are not considered. However, in multi-element deposits, the effects of other elements existing in the blocks on BEV should be considere...

متن کامل

Multiple Destination Influence on Production Scheduling in Multi-element Mines

In multi-element deposits, different blocks are blended together to create a product with a predetermined quality. Generally, blending aims to obtain a special quality and quantity based on determining the processing plant or customer needs. However, blending causes different products based on the deposit properties. Thus, a block is blended with others to create one of many possible products. ...

متن کامل

A new model for mining method selection based on grey and TODIM methods

One of the most important steps involved in mining operations is to select an appropriate extraction method for mine resources. After choosing the extraction method, it is usually impossible to replace it with another one because it may be so expensive that implementation of the entire project could be economically impossible. Choosing a mining method depends on the geological and geometrical c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Journal of environmental management

دوره 151  شماره 

صفحات  -

تاریخ انتشار 2015