Final Report about JRA1 Activity of RISC in the Frame of the SCIEnce Project
نویسنده
چکیده
In this paper, we report the outcome of our activity in the frame of the JRA1 work package of the SCIEnce project supported by the European Commission Framework 6 Programme. The work in this project is centered around SCSCP protocol which is a remote procedure call framework, in which both protocol messages and data are encoded in the OpenMath. By SCSCP different kinds of computer algebra systems may offer services and some others may employ them. In the first half of this document we present our development which is a software package which supports the usage of SCSCP from Wolfram Mathematica. The second half of this document we report the deployment of the SymGrid-Services software framework (developed in the frame of the SCIEnce project as well) at the environment of the RISC institute and the its integration with Wolfram Mathematica.
منابع مشابه
The Role of RFID to Improve Materials Flow in Mega-projects Site
In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...
متن کاملA heuristic method for consumable resource allocation in multi-class dynamic PERT networks
This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a n...
متن کاملThe Role of RFID to Improve Materials Flow in Mega-projects Site
In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...
متن کاملAnalysis of critical paths in a project network with random fuzzy activity times
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کاملالگوریتم جدیدی برای تحلیل حساسیت مسیر بحرانی در شبکه های پرت با درنظر گرفتن ریسک های موجود در پروژه
Taking into account, the uncertain time duration for each activity in a pert network, we would need to accept the notion that the critical path of the project could also vary a number of times during its execution. If these variations take place frequently during the project in an unpredictable manner, it could endanger the efficient management of that project, and in addition to lengthening th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2011