Resource-driven Scheduling for Repetitive Projects: a Pull-system Approach

نویسندگان

  • I-Tung Yang
  • Photios G. Ioannou
چکیده

Having resources work continuously has long been the goal for scheduling repetitive projects. Waste (unforced idleness) in repetitive projects is observed when labor and equipment (resources) are waiting, being idle, because the preceding resources have not finished their jobs. In this paper we investigate the existence and influence of unforced idleness. In contrast to the push-system approach used by traditional critical path method (CPM), we propose a pull-system scheduling system to eliminate unforced idleness in repetitive projects. We use the term pull in applying repetitive scheduling ideas to lean construction in a new way. The scheduling system is able to model general repetitive projects by relaxing impractical assumptions posted by previous models and provides a computational algorithm to generate planned and as-built graphical schedules. We also define the necessary elements of the scheduling system and describe the concept underlying a computational algorithm. A computer program, Repetitive Project Planner (RP2), is incorporated and a real-life pipeline project is implemented to demonstrate the application. The pull-system scheduling system can serve as a practical tool toward continuous work flow.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model for Automated Generation of Resource-driven Construction Schedule for Housing Industry

The efficacy of managing a construction project mainly depends on proper planning and scheduling. Mass housing projects are highly repetitive in nature, as the methods used for construction are often repetitive or cyclic. Resources are therefore being deployed repeatedly for the similar or identical tasks in these projects. In order to eradicate delays in mobilizing resources, an efficient reso...

متن کامل

Resource leveling scheduling by an ant colony-based model

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

متن کامل

Flexible resource management and its effect on project cost and duration

In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001