Acoustic surveys in the full monte: simulating uncertainty

نویسندگان

  • George Rose
  • Stéphane Gauthier
  • Gareth Lawson
چکیده

− A method is presented to estimate and diagnose the sources of uncertainty in acoustic survey measures of fish density. The method involves simultaneous Monte Carlo simulation of density and uncertainty resulting from imprecision in all terms in acoustic analyses. Known bias can also be considered. Results are presented from theoretical simulations based on assumed distributions of fish density and acoustic parameters at sample sizes from 10–1 000, and on survey data for Atlantic cod and redfish. Uncertainty can be reduced by either increasing the sample rate or by decreasing the error in input variables (system and ocean parameters, backscatter, target strength, species identification, detectability). Uncertainty in inshore cod surveys in Newfoundland waters can be attributed for the most part to heterogeneous fish distribution and detectability variance (total R2 = 0.64). Uncertainty in offshore redfish surveys is attributed to heterogeneous fish distribution, and variance in target strength and species identification (total R2 = 0.82). Uncertainty can be reduced by survey design, not only by the classical methods of achieving less diverse measures of backscatter, but also by increasing precision in the input parameters to the density estimate, in particular, target strength, detectability, and species identification. © 2000 Ifremer/CNRS/INRA/IRD/Cemagref/Éditions scientifiques et médicales Elsevier SAS acoustic survey / uncertainty / Monte Carlo / target strength / detectability / cod / redfish Résumé − Campagnes acoustiques mises à nu : simuler l’incertitude. Une méthode est présentée pour estimer et déterminer les caractéristiques des sources d’incertitude dans les mesures de densité de poissons lors des campagnes acoustiques. La méthode implique simultanément une simulation au hasard de la densité et de l’incertitude résultant de l’imprécision dans tous les termes des analyses acoustiques. Le biais connu peut aussi être considéré. Les résultats sont présentés à partir des simulations théoriques basées sur les distributions présumées de poissons et les paramètres acoustiques pour un échantillonnage entre 10 et 1 000 m, et pour des données sur la morue et le sébaste. L’incertitude peut être réduite soit en augmentant le taux d’échantillonnage ou en diminuant l’erreur des variables introduites (paramètres du système et océaniques, rétrodiffusion, indice de réflexion des cibles, identification des espèces, détectabilité). L’incertitude dans les campagnes de morue côtière dans les eaux de Terre Neuve peut être attribuée en grande partie à l’hétérogénéité de la répartition des poissons et à la variance de la détectabilité (R2 total = 0,64). L’incertitude dans les campagnes au large concernant le sébaste est attribué à l’hétérogénéité de la répartition des poissons, et à la variance de l’indice de réflexion et à l’identification de l’espèce (R2 total = 0,82). L’incertitude peut être réduite par le programme de campagne, non seulement par des méthodes classiques d’obtention de mesures moins hétérogènes de rétrodiffusion, mais aussi en augmentant la précision des paramètres introduits, ceux de l’estimation de la densité en particulier, l’indice de réflexion, la détectabilité et l’identification des espèces. © 2000 Ifremer/CNRS/INRA/IRD/Cemagref/Éditions scientifiques et médicales Elsevier SAS campagnes acoustiques / incertitude / Monte Carlo / indice de réflexion / détectabilité / morue / sébastes

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluating How the Islamic Republic of Iran Achieved its Vision Economic Goals by Designing and Computing a Composite Index and Using Monte Carlo Simulation Approach for Uncertainty Analysis

The Islamic Republic of Iran Vision aimed to direct development plans and yearly budgets. As one of the most important part, it includes 13 economic goals for directing economic route of the country for a twenty years period. After 15 years, evaluating how the country achieved to these goals is very important and unfortunately neglected. In this article, considering the different nature of goal...

متن کامل

Prediction of limit cycle oscillations under uncertainty using a Harmonic Balance method

The Harmonic Balance method is an attractive solution for computing periodic responses and can be an alternative to time domain methods, at a reduced computational cost. The current paper investigates using a Harmonic Balance method for simulating limit cycle oscillations under uncertainty. The Harmonic Balance method is used in conjunction with a nonintrusive polynomial-chaos approach to propa...

متن کامل

A New Model Considering Uncertainties for Power Market

Medium-term modeling of electricity market has essential role in generation expansion planning. On the other hand, uncertainties strongly affect modeling and consequently, strategic analysis of generation firms in the medium term. Therefore, models considering these uncertainties are highly required. Among uncertain variables considered in the medium term generation planning, demand and hyd...

متن کامل

Computational study of Anticancer Dasatinib for drug delivery systems

Dasatinib is a tyrosine kinase inhibitor (TKI) that is used to treat chronic myeloid leukemia and in the management of ulcerative colitis (UC) and to provide appropriate results in treatment. Dasatinib is significantly higher and faster than full cytogenetic and large molecular responses as compared to imatinib. In the recent study, using the NMR data, the frequency and thermochemical propertie...

متن کامل

Sensitivity and uncertainty analysis of sediment rating equation coefficients using the Monte-Carlo simulation (Case study: Zoshk-Abardeh watershed, Shandiz)

The sediment load estimation is essential for watershed management and soil conservation strategies. The sediment rating curve is the most common approach for estimating the sediment load when the observed sediment records are not available. With regard to the measurement errors and the limitation of available data, the sediment rating curve has a degree of uncertainty which should be accounted...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999