Project Scheduling - Theory and Practice

نویسنده

  • WILLY HERROELEN
چکیده

The project scheduling problem involves the scheduling of project activities subject to precedence and/or resource constraints. Of obvious practical importance, it has been the subject of intensive research since the late fifties. A wide variety of commercialized project management software packages have been put to practical use. Despite all these efforts, numerous reports reveal that many projects escalate in time and budget and that many project scheduling procedures have not yet found their way to practical use. The objective of this paper is to confront project scheduling theory with project scheduling practice. We provide a generic hierarchical project planning and control framework that serves to position the various project planning procedures and discuss important research opportunities, the exploration of which may help to close the theory-practice gap.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Project Scheduling Method Based on Fuzzy Theory

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Project resource investment problem under progress payment model

As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...

متن کامل

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009