Engineering Test Cases to Motivate the Formalization of an Aec Project Model as a Directed Acyclic Graph of Views and Dependencies
نویسنده
چکیده
To perform specific tasks, Architecture, Engineering, and Construction (AEC) professionals construct task-specific engineering views from information in other engineering views. Each view contains project information that is structured for an engineer’s specific task; engineers are responsible for the information in their respective views. This paper presents industry test cases illustrating that due to the multidisciplinary, constructive, iterative, and unique character of AEC projects, these professionals have difficulty constructing and integrating their task-specific views today. We propose that engineers will benefit from expressive, generic, formal, and simple methods to iteratively construct a view by formalizing its dependency on other views, and control the integration of a graph of these views as the project progresses. This process maps well to the way AEC projects work today and would result in an integrated yet emerging project model consisting of a directed acyclic graph of task-specific views and dependencies. We define requirements for such an approach, and discuss that, while partially satisfying the requirements, existing approaches do not yet provide engineers with tools explicitly designed to enable them to iteratively construct views from other views, and control the integration of a graph of these views as the project progresses. To address these requirements, this paper introduces the Perspective Approach.
منابع مشابه
CIFECENTER FOR INTEGRATED FACILITY ENGINEERING Engineering Test Cases to Motivate the Formalization of an AEC Project Model as a Directed Acyclic Graph of Views and Dependencies
This paper presents industry test cases that illustrate the multi-disciplinary, constructive, iterative, and unique character of AEC projects. These test cases show that, to perform their tasks on these projects, AEC engineers construct task-specific engineering views from information in other engineering views. These engineers have difficulty constructing and integrating task-specific views on...
متن کاملCIFECENTER FOR INTEGRATED FACILITY ENGINEERING Perspectors: Composable, Reusable Reasoning Modules to Automatically Construct a Geometric Engineering View from Other Geometric Engineering Views
As they design, plan, and execute AEC projects, engineers today construct task-specific geometric views based on information contained in other engineers’ geometric views. Traditionally, engineers have constructed these views manually, using pencils and more recently CAD. Manually constructing views is often difficult, time-consuming, and error-prone. Newer approaches develop central project mo...
متن کاملAn Integrated Risk-Based Technique for Project Plan Selection
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...
متن کاملPerspectors: composable, reusable reasoning modules to construct an engineering view from other engineering views
As engineers design, plan, and execute architecture, engineering, and construction (AEC) projects, they construct task-specific views. These views contain information that is structured for their specific tasks. Engineers generally construct these views based on information contained in other engineers’ views. Traditionally, engineers have manually constructed these views using pencils and more...
متن کاملCIFECENTER FOR INTEGRATED FACILITY ENGINEERING The Perspective Approach: Enabling Engineers to Construct and Integrate Geometric Views to Generate an Evolving Project Model
Enabling engineers to construct integrated and task-specific views of an evolving AEC project is an important and unresolved issue in both practice and research. Many current project-modeling approaches construct and integrate a predefined central model from which task-specific views are constructed. Others construct and integrate a “federation” of predefined task-specific views. AEC processes ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2004