Optimization of preventive maintenance schedule and production lot size

نویسندگان

  • Saad M.A. Suliman
  • Sayed Husain Jawad
چکیده

In this research, a developed mathematical model is proposed to optimize the preventive maintenance age and lot size for a single-unit production system producing a single item. The system is assumed to start in an in-control state producing items of acceptable quality and then after a period of production time the system may shift to an out-of-control state producing non-conforming items. The time for the system to shift is a random variable that is assumed to follow a general probability distribution. It is assumed that failure may occur at any time after the system shift to the out-of-control state. The system failure time is also assumed to follow a general probability distribution. The proposed model considers average total values of the maintenance, inventory holding, non-conforming items, and shortage costs. The results found indicated that the introduction of failure possibility decreased the production lot size for a specific preventive maintenance age. Sensitivity analysis is carried out to assess the effect of four cost parameters on model performance. Furthermore, the model is extended to consider the effects of: combining inspection with preventive maintenance; and introducing nonnegligible preventive maintenance duration. & 2012 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Technical Note: An opportunity cost maintenance scheduling framework for a fleet of ships: A case study

The conventional method towards deriving schedule for a fleet of ships to minimize cost alone has the short-coming of not addressing the problem of operation revenue losses associated with delays during maintenance at ships dockyards. In this paper, a preventive maintenance schedule for a fleet of ships that incorporates op-portunity cost is presented. The idea is to assign a penalty cost to al...

متن کامل

Periodic flexible maintenance planning in a single-machine production environment

Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans as certain as possible. In a single-machine production environment, this paper proposes a simulation–o...

متن کامل

A fixed and flexible maintenance operations planning optimization in a parallel batch machines manufacturing system

Scheduling has become an attractive area for artificial intelligence researchers. On other hand, in today's real-world manufacturing systems, the importance of an efficient maintenance schedule program cannot be ignored because it plays an important role in the success of manufacturing facilities. A maintenance program may be considered as the heath care of manufacturing machines and equipments...

متن کامل

Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines

The buffer allocation problem is an NP-hard combinatorial optimization problem, and it is an important design problem in manufacturing systems. The research proposed in this paper concerns a product line consisting of n unreliable machines with n − 1 buffers and a preventive maintenance policy. The focus of the research is to obtain a better trade-off between the buffer level ...

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015