The Impact of Design Rework on Construction Project Performance

نویسندگان

  • Ying Li
  • Timothy R. B. Taylor
چکیده

Rework in construction development projects can significantly degrade project cost and schedule performance. In a typical construction development project which involves design and construction, rework in the construction phase could increase construction cost by 10%-15% of the contract price (Burati. 1992, Josephson & Hammerlund 1999, Love & Li 2000). The proportion of money and time spent on rework in the design phase is usually higher (Smith & Eppinger 1997). In large, complex projects, undiscovered rework in the design phase can induce rework in the construction phase. The time when rework is discovered during the project development process affects the impact of rework on overall project performance. However, available knowledge is not always successful in improving project managers’ understanding of the feedback mechanisms which drive undiscovered rework impacts on project performance, specifically the interaction between different phases during the developing process. The current work uses a system dynamics model of a two phase project development cycle to identify high leverage points for minimizing the impacts of rework on development project performance. Model analysis suggests that failing to discover rework near its creation in the project development process can magnify the impact of rework on project performance.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Measuring the Impact of Rework on Construction Cost Performance

Rework continues to affect both cost and schedule performance throughout the construction industry. The direct costs alone often tally to 5% of the total construction costs. Using the data obtained from 359 construction projects in the Construction Industry Institute database, this paper assesses the impacts of rework on construction cost performance for projects in various categories. In addit...

متن کامل

Reducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM)

One of the important problems in the field of Construction Industry is ‘rework’. It affects time, costs, quality, and almost every criteria of project success. As a result of rework and ineffective use of resources and materials in the workshops, there is always a considerable loss of resources, materials, investments, and workforce-time. Designing and planning through full awareness of clients...

متن کامل

Factors Affecting Rework Costs in Construction

Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the influence of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationship between the contributing factors, and to determine a model for rework prediction....

متن کامل

Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects

While it is widely recognized that additional costs due to rework can have an adverse effect on project performance, limited empirical research has been done to investigate the influencing factors. The research presented in this paper aims to determine the influence of different project types and procurement methods on rework costs in construction projects. Using a questionnaire survey, rework ...

متن کامل

A system dynamics model for assessing the impacts of design errors in construction projects

Design errors leading to rework and/or design changes are considered to be the primary contributor to schedule delays and cost overruns in design and construction projects. While design errors are deemed prevalent, most design and construction firms do not measure the number of errors they create, thereby having limited knowledge regarding their mechanism to undermine project performance. To ad...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011