Modelling the Influence of Maintenance Actions

نویسندگان

  • Waltraud Kahle
  • Charles E. Love
چکیده

An operating system is observed to undergo failures. On failure, one of three actions was taken: failures were minimally repaired, given a minor repair or given a major repair. Furthermore, periodically the machine was stopped for either minor maintenance action or major maintenance action. Either on failure or maintenance stoppage, both minor and major repairs are assumed to impact the failure intensity. The issue in this research is to identify the virtual aging process associated with repairs. A series of models appropriate for such an operating/maintenance environment are developed and estimated in order to identify the most appropriate statistical structure. Field data from an industrial setting are used to fit the models.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines

The buffer allocation problem is an NP-hard combinatorial optimization problem, and it is an important design problem in manufacturing systems. The research proposed in this paper concerns a product line consisting of n unreliable machines with n − 1 buffers and a preventive maintenance policy. The focus of the research is to obtain a better trade-off between the buffer level ...

متن کامل

A reliability-based maintenance technicians’ workloads optimisation model with stochastic consideration

The growing interest in technicians’ workloads research is probably associated with the recent surge in competition. This was prompted by unprecedented technological development that triggers changes in customer tastes and preferences for industrial goods. In a quest for business improvement, this worldwide intense competition in industries has stimulated theories and practical frameworks that ...

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

Optimal Estimation of Weibull Distribution Parameters in order to Provide Preventive-Corrective Maintenance Program for Power Transformers

In this paper, a new method for modelling and estimation of reliability parameters of power transformer components in distribution and transmission voltage levels for preventive-corrective maintenance schedule of transformers is proposed. In this method, with optimal estimation of Weibull distribution parameters using least squares method and input data uncertainty reduction, failure rate and p...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002