Method for Measurement of Uncertainty Applied to the Formation of Interval Type-2 Fuzzy Sets

نویسندگان

  • Mauricio A. Sanchez
  • Oscar Castillo
  • Juan R. Castro
چکیده

This paper proposes a new method for directly discovering the uncertainty from a sample of discrete data, which is then used in the formation of an Interval Type-2 Fuzzy Inference System. A Coefficient of Variation is used to measure the uncertainty on a finite sample of discrete data. Based on the maximum possible coverage area of the Footprint of Uncertainty of Gaussian membership functions, with uncertainty on the standard deviation, which then are modified according to the found index values, obtaining all antecedents in the process. Afterwards, the Cuckoo Search algorithm is used to optimize the Interval Sugeno consequents of the Fuzzy Inference System. Some sample datasets are used to measure the output interval coverage.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Criteria Analysis Model under an Interval Type-2 Fuzzy Environment with an Application to Production Project Decision Problems

Using Multi-Criteria Decision-Making (MCDM) to solve complicated decisions often includes uncertainty, which could be tackled by utilizing the fuzzy sets theory. Type-2 fuzzy sets consider more uncertainty than type-1 fuzzy sets. These fuzzy sets provide more degrees of freedom to illustrate the uncertainty and fuzziness in real-world production projects. In this paper, a new multi-criteria ana...

متن کامل

Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...

متن کامل

Operation Planning of Wind Farms with Pumped Storage Plants Based on Interval Type-2 Fuzzy Modeling of Uncertainties

The operation planning problem encounters several uncertainties in terms of the power system’s parameters such as load, operating reserve and wind power generation. The modeling of those uncertainties is an important issue in power system operation. The system operators can implement different approaches to manage these uncertainties such as stochastic and fuzzy methods. In this paper, new ...

متن کامل

An integrated multi-criteria decision-making methodology based on type-2 fuzzy sets for selection among energy alternatives in Turkey

Energy is a critical factor to obtain a sustainable development for countries and governments. Selection of the most appropriate energy alternative is a completely critical and a complex decision making problem. In this paper, an integrated multi-criteria decision-making (MCDM) methodology based on type-2 fuzzy sets is proposed for selection among energy alternatives. Then a roadmap has been cr...

متن کامل

Type-2 fuzzy set extension of DEMATEL method combined with perceptual computing for decision making

Most decision making methods used to evaluate a system or demonstrate the weak and strength points are based on fuzzy sets and evaluate the criteria with words that are modeled with fuzzy sets. The ambiguity and vagueness of the words and different perceptions of a word are not considered in these methods. For this reason, the decision making methods that consider the perceptions of decision...

متن کامل

An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015