Feedback control for priority rules in re-entrant semiconductor manufacturing

نویسندگان

  • Fenglan He
  • Dieter Armbruster
  • Michael Herty
  • Ming Dong
چکیده

Typical semiconductor production is re-entrant and hence requires priority decisions when parts compete for production capacity at the same machine. A standard way to run such a factory is to start to plan and to finish according to demand. Often this results in a push policy where early production steps have priority over later production steps at the beginning of the production line and a pull policy where later steps have priority at the end of the production line. The point where the policies switch is called the push–pull-point (PPP). We develop a control scheme based on moving the PPP in a continuum model of the production flow. We show that this control scheme significantly reduces the mismatch between demand and production output. The success of the control scheme as a function of the frequency of control action is analyzed and optimal times between control actions are determined. 2015 Elsevier Inc. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling the Effect of Hot Lots in Semiconductor Manufacturing Systems [Correspondence] - Semiconductor Manufacturing, IEEE Transactions on

The presence of hot lots or high-priority jobs in semiconductor manufacturing systems is known to significantly affect the cycle time and throughput of the regular lots since the hot lots get priority at all stages of processing. In this paper, we present an efficient analytical model based on re-entrant lines and use an efficient, approximate analysis methodology for this model in order to pre...

متن کامل

A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II

In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization of the production rate and the other is the minimization of processing time. The system has m stations and can process several products in a moment. The re-entrant flow sho...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Output Feedback Stabilization for a Scalar Conservation Law with a Nonlocal Velocity

In this paper, we study the output feedback stabilization for a scalar conservation law with a nonlocal velocity that models a highly re-entrant manufacturing system as encountered in semiconductor production. By spectral analysis, we obtain a complete result on the exponential stabilization for the linearized control system. Moreover, by using a Lyapunov function approach, we also prove the ex...

متن کامل

Optimal control of a linearized continuum model for re-entrant manufacturing production systems

A re-entrant manufacturing system producing a large number of items and involving many steps can be approximately modeled by a hyperbolic partial differential equation (PDE) according to mass conservation law with respect to a continuous density of items on a production process. The mathematic model is a typical nonlinear and nonlocal PDE and the cycle time depends nonlinearly on the work in pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015