An Algorithm for Coalescing Operations with Precedence Constraints in Real-Time Systems
نویسندگان
چکیده
Real-time computations have deadline constraints. In addition to providing a result with a correct value, a real-time computation must produce the result before the deadline. A real-time system usually has many jobs sharing system resources, such as CPU and I/O devices. The system must provide a feasible schedule for all jobs so that they can finish executions before their deadlines. In many applications [ 1,3], real-time systems are modeled as object-oriented systems. In an object-oriented system, each object has a set of well-defined operations. Each object also has local variables, which may be accessed only
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملValue-density algorithms to handle transient overloads in scheduling
Systems with timing constraints have become pervasive in several disciplines, such as real-time arti-cial intelligence, operating systems, operations research , and local area networks. Most of the work in real-time system scheduling deals with admission control algorithms to guarantee that accepted tasks will meet their deadlines. In this paper, we compare the diierent algorithms, and suggest ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Inf. Process. Lett.
دوره 46 شماره
صفحات -
تاریخ انتشار 1993