Selecting R&D projects at BMW: a case study of adopting mathematical programming models

نویسندگان

  • Christoph H. Loch
  • Michael T. Pich
  • Christian Terwiesch
  • Michael Urbschat
چکیده

R&D project selection is a critical interface between the product development strategy of an organization and the process of managing projects day-to-day. This article describes the project selection problem faced by the transmission pre-development group of BMW. The group had to choose a portfolio of projects to set the foundation for the “best powertrain 2000.” This problem of project selection was structured as minimizing the gap between target performance and actual performance along chosen criteria. A mathematical programming model helped this organization to increase the transparency of their selection process, which previously had been based on experience coupled with evaluation of individual projects in isolation. The model was used to structure data collection, to apply to consistent criteria to the selection of pre-development projects, and to compare weighted project benefits. Implementation was a success in that the pre-development group continues to use it to make better decisions. However, the organization did not use the model for constrained optimization. We see two reasons for this partial implementation of the model. First, .an analytical model cannot capture all considerations relevant to optimization (e.g., uncertainty or strategic fit). Thus, constrained optimization promised only marginal further benefits while requiring substantial additional effort. Second, the diffusion of the analytical model from academia to industry faced the same problems as any technology transfer: Significant tacit knowledge must be transferred along with the codified knowledge of the analytical model. This required iterated problem solving, which itself required the limited time and resources of the diffusing agents (academia) as well as the adopting agents (industry). Thus, the organization adopted only those elements of the modeling method that could be transferred within the resource constraints, focusing on those elements offering the highest benefit per effort invested.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Comprehensive Model for R and D Project Portfolio Selection with Zero-One Linear Goal-Programming (RESEARCH NOTE)

Technology centered organizations must be able to identify promising new products or process improvements at an early stage so that the necessary resources can be allocated to those activities. It is essential to invest in targeted research and development (R and D) projects as opposed to a wide range of ideas so that resources can be focused on successful outcomes. The selection of the most ap...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

A Model for Project Selecting with Limited Resources in Data Envelopment Analysis with Input and Output Fuzzy

In Evaluating Performance, Selecting a Subset from a Set of Solutions with Limited Resources is Essential. If There Is More Than One Input and Output, the Data Rnvelopment Analysis Optimization Models Are Evaluated and Performance Measurement Based on the Weighted Output Is Divided Weighted Input. In This Research, Two Models of Optimization with Limited Resources Present from Data Envelopment ...

متن کامل

Two models of inventory control with supplier selection in case of multiple sourcing: a case of Isfahan Steel Company

Selecting the best suppliers is crucial for a company’s success. Since competition is a determining factor nowadays, reducing cost and increasing quality of products are two key criteria for appropriate supplier selection. In the study, first the inventories of agglomeration plant of Isfahan Steel Company were categorized through VED and ABC methods. Then the models to supply two important kind...

متن کامل

The project portfolio selection and scheduling problem: mathematical model and algorithms

This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IEEE Trans. Engineering Management

دوره 48  شماره 

صفحات  -

تاریخ انتشار 2001