Research on Optimization of Earned Value Management Method in Engineering Budget Management

نویسندگان

  • Ji Gedi
  • Chang Qing
چکیده

Earned Value Management Method (EVM), widely used in the world, is a project management method of costschedule integrated control. But the traditional EVM sometimes cannot provide an accurate result. In this paper, a practical method is given to analyze the project performance, in which the Network Diagram Method and the Critical Path Method have been introduced into EVM system that can better reflect the practical situation of a project. This improved method can be referred to assub-level earned value analysis method. This method can correct variance in the duration and cost forecast of the traditional EVM, and can also provide more information about the cause analysis.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017