The work breakdown structure in software project management

نویسنده

  • Robert Tausworthe
چکیده

The work breakdown structure (WBS) is a vehicle for breaking an engineering project down into subproject, tasks, subtasks, work packages, and so on. It is an important planning tool which links objectives with resources and activities in a logical framework. It becomes an important status monitor during the actual implementation as the completions of subtasks are measured against the project plan. Whereas the WBS has been widely used in many other engineering applications, it has seemingly only rarely been formally applied to software projects, for various reasons. Recent successes with software project WBSs, however, have clearly indicated that the technique can be applied and have shown the benefits of such a tool in management of these projects. This paper advocates and summarizes the use of the WBS in software implementation projects. It also identifies some of the problems people have had generating software WBSs, and the need for standard checklists of items to be included.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)

In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...

متن کامل

Process Centric Business Case Analysis for Easing Software Project Management Challenges

Software Project management involves coordinating various aspects of a project in order to bring forth a positive result. There have been increasing challenges faced by Project Managers. The major challenges of project management include unrealistic deadlines, communication deficit, uncertain dependencies, failure to manage risk and invisibility of the intermediate products. Meeting these chall...

متن کامل

Project Management System Based on Work-Breakdown-Structure Process Model

We have developed a “WBS(Work Breakdown Structure) process model” for a business application software development project. We have also developed a project management system called “PRO-NAVI” which works on the “WBS process model.” This WBS process model” provides (1) mutual mapping between the “software development processes”, “activities”, “products”, “know-how,” “rules”, and “standards”, and...

متن کامل

Work Breakdown Structure: A Tool for Software Project Scope Verification

Software project scope verification is a very important process in project scope management and it needs to be performed properly and thoroughly so as to avoid project rework and scope creep. Moreover, software scope verification is crucial in the process of delivering exactly what the customer requested and minimizing project scope changes. Well defined software scope eases the process of scop...

متن کامل

A Project-Product Model-Based Approach to Planning Work Breakdown Structures of Complex System Projects

—Project planning practices employ various methods at various stages, with work breakdown structure (WBS) being a prominent starting point. Using WBS, the components and associated enabling products are often not explicitly expressed. We first introduce the notions of generic project construct and system build. Using a running example of a simplified unmanned aerial vehicle, we review the WBS m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Journal of Systems and Software

دوره 1  شماره 

صفحات  -

تاریخ انتشار 1980