Cost Estimations for Large Scale Engineering Projects under Uncertainties
نویسندگان
چکیده
Cost estimation for large projects can be difficult because of many complex factors and uncertainties involved. It is often the case that only very rough guesses of actual costs may be provided. In this paper, we will examine the various types of uncertainties in the cost estimation problem of the Myrrha project. We will then use a few examples originated from the conceptual phase of the project to illustrate the practical use of a software package, IDS Cost Estimator, in cost analysis of nuclear systems. It is demonstrated that IDS Cost Estimator can take care of several types of uncertainties in cost estimation and provide user friendly interfaces for data collection, reporting and display.
منابع مشابه
Cost Estimations for Large Scale Engineering Projects under Various Uncertainties --Case Study for the Myrrha Machine with Intelligent Decision Systems
In this informal talk, we will present various uncertainty theories for different purposes within cost estimations for large scale engineering projects. We will provide a detailed case-study on the Myrrha project and illustrate the power of intelligent decision system to the cost-benefit analysis of nuclear systems.
متن کاملEffects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملOptimal Sizing of Energy Storage System in A Renewable-Based Microgrid Under Flexible Demand Side Management Considering Reliability and Uncertainties
Utilization of energy storage system (ESS) in microgrids has turned to be necessary in recent years and now with the improvement of storage technologies, system operators are looking for an exact modeling and calculation for optimal sizing of ESS. In the proposed paper, optimal size of ESS is determined in a microgrid considering demand response program (DRP) and reliability criterion. Both lar...
متن کاملConcurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...
متن کاملA Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...