On rescheduling due to machine disruption while to minimize the total weighted completion time

نویسندگان

  • Wenchang Luo
  • Taibo Luo
  • Randy Goebel
  • Guohui Lin
چکیده

We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is represented as an unavailable time interval and is revealed to the production planner before any job is processed; the production planner wishes to reschedule the jobs to minimize the alteration to the originally planned schedule, which is measured as the maximum time deviation between the original and the new schedules for all the jobs. The objective function in this rescheduling problem is to minimize the sum of the total weighted completion time and the weighted maximum time deviation, under the constraint that the maximum time deviation is bounded above by a given value. That is, the maximum time deviation is taken both as a constraint and as part of the objective function. We present a pseudo-polynomial time exact algorithm and a fully polynomial time approximation scheme, the latter of which is the best possible given that the general problem is NP-hard. 1998 ACM Subject Classification Dummy classification – please refer to http://www.acm.org/ about/class/ccs98-html

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

متن کامل

A Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times

We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean co...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machine

A batch machine is a machine that can process a number of jobs simultaneously as a batch, and the processing time of a batch is equal to the longest processing time of the jobs assigned to it. In this paper we present a polynomial time approximation scheme (PTAS) for scheduling a batch machine to minimize the total completion time with job release dates. Also, we present a fully polynomial time...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • CoRR

دوره abs/1701.07498  شماره 

صفحات  -

تاریخ انتشار 2017