Assessment of Effective Risk in Software Projects based on Wallace’s Classification Using Fuzzy Logic
نویسندگان
چکیده
Software development always faces unexpected events such as technology changes, environmental changes, changing user needs. These changes will increase the risk in software projects. We need to risk management to deal with software risks. Risk assessment is one of the most important factors in risk and pro ject management of software projects. In this paper, we use Wallace’s work and five factors to present an efficient method to measure software risk using fuzzy logic. Team, Planning, Complexity, Requirements and User are factors that we use in this paper. Results of experiments shows that our framework is more efficient than other frameworks and approaches for risk assessment in software projects.
منابع مشابه
Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...
متن کاملSafety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S
Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...
متن کاملEvaluation of geomorphology method application for flood Hazards risk classification using Fuzzy Logic (Case study: Ojan Chay drainage basin)
Past decades damage by floods in Iran and on the other of the world has shown that we have still much work to do to cope with this problem. Hence, the study of these events and development of more effective adaptation and mitigation policies has become a priority, in other parts of the globe. First step in achieving flood risk assessment is data collection. Availability, suitability and quality...
متن کاملPower plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method
Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...
متن کاملDetermination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic
The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...