Modeling of Multi-Level Capacitated Lot-Size Scheduling Problem

نویسندگان

  • Zuhaimy Ismail
  • Diyana Abd Mahad
چکیده

Problem statement: Lot-size is the clustering of items for transportation or manufacturing processes occurring at the same time. The issue in lot-size problem is to design production processes so that the feasible production quantities are equal to customer demand quantities and the timing of production is such that inventory positions are almost zero. Approach: In this study, we explore the multi-level lot-size and scheduling problem. It is on a multi-level capacitated lot-size problem or known as the multi-level lot-size problem with bottlenecks. Two models were introduced to solve the multi-level lot-size problem namely the Billington model and Alf Kimms model. Using these models, a simple heuristic method was designed to solve a multi level capacitated lot sizing scheduling problem. Results: In this study, we showed that Alf Kimms model is more efficient than Billington model. The result given by Alf Kimms model is always feasible without further modification unlike the Billington model. This is due to the way the constraint is devised to ensure the inventory balance. The constraint used in Alf Kimms model ensures that inventory in hand is always sufficient to fulfill the demand occurred in each period. However, the use of this constraint in Billington model is to ensure that the total production for each item is always greater than or equal to the total external demand in the time horizon. Therefore, without some form of modification, the result given by Billington model will be infeasible production plan. Conclusion: A comparative study between these models shows that both models were successfully devised to solve capacitated multi-level lot sizing problem with the objective function to minimize the total holding costs and setupcost. This study also shows that the production schedule will always start at the last period because this will give the lowest costs and it also shows that Alf Kimms model gives a set of feasible sub-optimal schedule compare to Billington model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A hybrid ant colony optimization algorithm to optimize capacitated lot-sizing problem

The economical determination of lot size with capacity constraints is a frequently complex, problem in the real world. In this paper, a multi-level problem of lotsizing with capacity constraints in a finite planning horizon is investigated. A combination of ant colony algorithm and a heuristic method called shifting technique is proposed for solving the problem. The parameters, including the co...

متن کامل

A Multi-level Capacitated Lot-sizing Problem with Safety Stock Deficit and Production Manners: A Revised Simulated Annealing

[1] Corresponding author e-mail: [email protected]   [1] Corresponding author e-mail: [email protected]   Lot-sizing problems (LSPs) belong to the class of production planning problems in which the availability quantities of the production plan are always considered as a decision variable. This paper aims at developing a new mathematical model for the multi-level ca...

متن کامل

Three Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing

This paper proposes a new mixed integer programming model for multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages in closed-loop supply chains. The returned products from customers can either be disposed or be remanufactured to be sold as new ones again. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA) al...

متن کامل

A Heuristic Solution of Multi-item Single Level Capacitated Dynamic Lot-sizing Problem

The multi-item single level capacitated dynamic lot-sizing problem consists of scheduling N items over a horizon of T periods. The objective is to minimize the sum of setup and inventory holding costs over the horizon subject to a constraint on total capacity in each period. No backlogging is allowed. Only one machine is available with a fixed capacity in each period. In case of a single item p...

متن کامل

Lot Sizing and Scheduling in Flow Shop with Sequence-Dependent Setups and Backlogging

Lot sizing and scheduling in flow shop has been considered in this paper. Our study includes a multi-level and multi-period capacitated lot sizing and scheduling problem (CLSP) with sequence-dependent setups, setups carry over in flow shop. In manufacturing environments backlogging is unavoidable. If the production capacity is infinite, any demand can be satisfied

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011