A Heuristic for the Short-Term Planning of Multi- Product Continuous Plants
نویسندگان
چکیده
We consider the short-term production planning of multi-product continuous plants. In the literature this problem is generally modeled as a large-size monolithic mixed-integer linear or nonlinear program. In this paper we follow a decomposition approach which partitions the problem into an operations planning and an operations scheduling problem. The operations planning problem consists in assigning the production tasks to the processing units, fixing the operating conditions of the tasks, and computing the number of operations executed for each task. This problem can be formulated as a nonlinear program of moderate size containing only one integer variable. The solution to the operations planning problem provides a set of operations, which have to be scheduled on the processing units. For this operations scheduling problem we present a novel mixedinteger linear programming formulation as well as a fast priority-rule based scheduling method. In contrast to the classical monolithic approaches, our new method is able to find good feasible schedules for large-scale instances within less than five seconds.
منابع مشابه
A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملMeta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain
In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...
متن کاملShort and Mid-Term Wind Power Plants Forecasting With ANN
In recent years, wind energy has a remarkable growth in the world, but one of the important problems of power generated from wind is its uncertainty and corresponding power. For solving this problem, some approaches have been presented. Recently, the Artificial Neural Networks (ANN) as a heuristic method has more applications for this propose. In this paper, short-term (1 hour) and mid-term (24...
متن کاملShort and Mid-Term Wind Power Plants Forecasting With ANN
In recent years, wind energy has a remarkable growth in the world, but one of the important problems of power generated from wind is its uncertainty and corresponding power. For solving this problem, some approaches have been presented. Recently, the Artificial Neural Networks (ANN) as a heuristic method has more applications for this propose. In this paper, short-term (1 hour) and mid-term (24...
متن کاملBi-product inventory planning in a three-echelon supply chain with backordering, Poisson demand, and limited warehouse space
In this paper, we apply continuous review (S-1, S) policy for inventory control in a three-echelon supply chain (SC) including r identical retailers, a central warehouse with limited storage space, and two independent manufacturing plants which offer two kinds of product to the customer. The warehouse of the model follows (M/M/1) queue model where customer demands follow a Poisson probabilit...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2008