Understanding stakeholders' perspective of cost estimation in project management

نویسنده

  • Hemanta Kumar Doloi
چکیده

Cost overrun is a chronic problem across most projects. While a significant research have been published on this topic, the understanding of the root causes and a clear direction towards improvement remained unexplored. The focus of the past research is mainly on the factors directly or indirectly associated with the project environment and their relative impacts on overall cost performance in projects. In contrast to such traditional approach, this research aimed to establish a conceptual model by identifying the underlying issues associated mainly with the perceptions of the board stakeholders involved over entire lifecycle of projects. Based on a structured interview with a few selective organisations, data was collected and a few rich pictures were developed over every phase of project development. By employing the soft system methodology, the rich pictures were later trasformed into the concept models for potential establishment of a new body of knowledge in the field. Among the findings, it has been revealed that at the project inception stage, political and legislative factors play significant roles in the business case development. Statutory compliance and environmental issues are perceived to be critical in influencing cost performance in projects. The resulting concept model on cost overrun is expected to fill a significant knowledge gap in cost estimation practice across all industry sectors. © 2010 Elsevier Ltd. and IPMA. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stakeholders\' perspective on health equity and its indicators in Iran

Background: In this regard, in Iran a plan was developed and accordingly 52 indicators to measure equity inhealth were developed and announced by the Ministry of Health in collaboration with other sectors.This study aims to obtain a deeper understanding of the development of health equity indicators andidentify their implementation challenges and proposed solutions from the perspective of polic...

متن کامل

“Wood Already Touched by Fire is not Hard to Set Alight”; Comment on “Constraints to Applying Systems Thinking Concepts in Health Systems: A Regional Perspective from Surveying Stakeholders in Eastern Mediterranean Countries”

A major constraint to the application of any form of knowledge and principles is the awareness, understanding and acceptance of the knowledge and principles. Systems Thinking (ST) is a way of understanding and thinking about the nature of  health systems and how to make and implement decisions within health systems to maximize desired and minimize undesired effects. A major constraint to applyi...

متن کامل

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

مروری بر روش‌های تخمین هزینه نرم‌افزار مبتنی بر یادگیری ماشین

Software project management software is the most important activity in software development, because it contains the whole software development process, from beginning to end. Software cost estimation is a challenge task in the software project management. It is an old activity in computer industry from 1940s and has been developed many times. Effort, only covers part of the cost of a software ...

متن کامل

Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method

Smooth implementation and controlling conflicting goals of a project with the usage of all related resources through organization is inherently a complex task to management. At the same time deterministic models are never efficient in practical project management (PM) decision problems because the related parameters are frequently fuzzy in nature. The project execution time is a major concern o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015