Floodplain Planning with Risk-based Optimization

نویسنده

  • Jay R. Lund
چکیده

Economical integration of permanent and emergency flood control options is a long-standing problem in water resources planning and management. A two-stage linear programming formulation of this problem is proposed and demonstrated which provides an explicit economic basis for developing integrated floodplain management plans. The approach minimizes the expected value of flood damages and costs, given a flow or stage frequency distribution. A variety of permanent and emergency floodplain management options can be examined in the method, and interactive effects of options on flood damage reduction can be represented. The approach is demonstrated and discussed for a hypothetical example. Limitations of the method in terms of forecast uncertainty and concave additive damage function forms also are discussed, along with extensions for addressing these more difficult situations. INTRODUCTION The effectiveness of floodplain management options has long been recognized, and such options have come to be considered integral with classical structural options for addressing flood control problems (USACE 1976; White 1945; Wood, et al. 1985; Lind 1967). But integrated floodplain planning with probabilistic flood descriptions remains a problem. The most common economic framework for floodplain management is minimization of expected annual damages and flood management expenses (structural and non-structural flood control options) (WRC 1983; Goodman 1984). This form of probabilistic benefit-cost analysis largely has replaced older forms of economic analysis performed by examining only a particular design flood, such as a flood of record or an estimated 100-year event. Recently, more probabilistic approaches have become common, considering the damages that would result from a full range of probability-weighted flood events (Davis, et al., 1972; USACE 1996) and for long-term dynamic floodplain planning (Olsen, et al. 2000). This has improved the application of benefitcost analysis for flood control problems, although considerable work remains to be done. Within this newer form of analysis, a great deal of research has been devoted to the assignment of probabilities to the range of flood event discharges and flood stages (Cunnane 1978; USACE 1996). The assignment of probabilities in an expected damage evaluation framework has received considerable attention (Arnell 1989; Beard 1997; Goldman 1997; Stedinger 1997). Much of this controversy remains unresolved. The estimation of damages associated with inundation to a given stage/elevation also has received considerable attention (USACE 1988).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Climate change, urbanization, and optimal long-term floodplain protection

[1] This paper examines levee-protected floodplains and economic aspects of adaptation to increasing long-term flood risk due to urbanization and climate change. The lower American River floodplain in the Sacramento, California, metropolitan area is used as an illustration to explore the course of optimal floodplain protection decisions over long periods. A dynamic programming model is develope...

متن کامل

Risk-based floodplain management: A case study from Greece

The use of engineering risk analysis and multi-objective decision-making under risk are considered as tools for floodplain management and extreme flood protection. Distinction is made between (a) the catchment or large scale planning and (b) the local or small-scale design of protection measures. After defining the risk of flooding at different scales and specifying the multiple criteria that m...

متن کامل

The 1994 Flood of the Giofyros Basin on the Crete Island: a Case Study of Risk-based Floodplain Management

Engineering Risk Analysis and Multi-Objective Decision-Making Under Risk are considered as a general framework for floodplain management and protection from extreme floods. Distinction is made between (a) the catchment or large scale planning and (b) the local or small scale design of protective measures. After defining the risk of flooding at different scales and multiple criteria for selectin...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-SAFETY USING GENETIC ALGORITHM

Safety risk management has a considerable effect on disproportionate injury rate of construction industry, project cost and both labor and public morale. On the other hand time-cost optimization (TCO) may earn a big profit for project stakeholders. This paper has addressed these issues to present a multi-objective optimization model to simultaneously optimize total time, total cost and overall ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001