Parallel Machine Scheduling Problem
نویسندگان
چکیده
A new constructive heuristic for the scheduling problem of n independent jobs on m identical parallel machines with minimum makespan objective is described. The proposed algorithm, which is an n logn algorithm as the LPT algorithm of Graham, iteratively combines partial solutions that are obtained by partitioning the set of jobs in suitable families of subsets. The algorithm was tested using different families of instances which were taken from the literature and results compared with other well known algorithms. Mathematics Subject Classification: 90C59, 90B35
منابع مشابه
A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملA Mathematical Model of a Multi-Criteria Parallel Machine Scheduling Problem: a Genetic Algorithm (RESEARCH NOTE)
.
متن کاملA New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...
متن کاملA Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness
This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...
متن کاملA New Hybrid Meta-Heuristics Approach to Solve the Parallel Machine Scheduling Problem Considering Human Resiliency Engineering
This paper proposes a mixed integer programming model to solve a non-identical parallel machine (NIPM) scheduling with sequence-dependent set-up times and human resiliency engineering. The presented mathematical model is formulated to consider human factors including Learning, Teamwork and Awareness. Moreover, processing time of jobs are assumed to be non-deterministic and dependent to their st...
متن کاملDesign of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...
متن کامل