Efficient parallel evolutionary algorithms for deadline-constrained scheduling in project management

نویسنده

  • Sergio Nesmachnow
چکیده

Deadline-constrained scheduling in project management is a NP-hard optimisation problem with major relevance in software engineering and other real-life situations dealing with the planning of activities that must be completed before specific dates. This article introduces efficient parallel versions for two evolutionary algorithms (genetic algorithm and hybrid evolutionary algorithm), to solve the deadline-constrained scheduling problem in project management. The proposed algorithms have been engineered to compute accurate solutions in reduced execution times. Specific evolutionary operators, including a parallel local search operator in the hybrid evolutionary algorithm, are proposed for efficiently solving realistic problem instances, and both a master-slave parallel strategy and a distributed subpopulation model are applied to further improve the computational efficiency and the results quality. The experimental analysis performed on both a set of standard problem instances and new large problem instances demonstrate that accurate solutions are computed by the proposed techniques, especially for the distributed subpopulation version of the hybrid evolutionary algorithm. The comparative experimental evaluation demonstrates that the parallel evolutionary algorithms are able to outperform in reduced execution times the results computed using one of the best well-known deterministic techniques for the problem, in particular when solving instances with tight deadline constraints.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

An Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation

In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016