AN EVALUATION OF THE 360o PROJECT MANAGEMENT COMPETENCY ASSESSMENT QUESTIONNAIRE D THERON Human Resources, SASOL Technology

نویسنده

  • G ROODT
چکیده

The primary purpose of this study was to evaluate a 360o project management competency questionnaire relevant to a chemical engineering environment. The competency questionnaire was developed using the input of the employees who took part in the appraisal. The secondary purpose of this study was to determine if significant differences existed between the multi-rater competency evaluations of different rater groups. Eighty technically qualified employees within a technology development environment were each evaluated by a number of raters, including themselves, their managers, customers and peers. In the case of both the Importance and the Performance Scales, single factors were extracted with internal reliabilities of 0,943 and 0,941 respectively. No significant differences were obtained on paired t-tests between the various rater groups. These findings and their implications are further discussed.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Manager Competency Model based on ANP Method in Construction Projects

Most developed countries have already accepted‘’ Competency’’ as the major factor in making management more competitive, therefore they have discovered the importance of Qualification Models and their application to cause human resources growth. Consequently, their aim is to improve the qualification of their human resources, and to reach this end, considering different ways of assessing compet...

متن کامل

A Comprehensive Model for R and D Project Portfolio Selection with Zero-One Linear Goal-Programming (RESEARCH NOTE)

Technology centered organizations must be able to identify promising new products or process improvements at an early stage so that the necessary resources can be allocated to those activities. It is essential to invest in targeted research and development (R and D) projects as opposed to a wide range of ideas so that resources can be focused on successful outcomes. The selection of the most ap...

متن کامل

An Analytic Model for Organization Readiness of Engineering Project Management Based on Virtual Teams

 The Organization Readiness of Engineering Project Management Based on Virtual Teams has been analyzed in an Iranian Engineering firm. Adapting and analyzing the latest readiness model, experts’ opinions were received by questionnaires and main criteria of the readiness have been identified. The considered readiness criteria are: Infrastructure, Deliverables (Drawings, Reports, Minutes of Meeti...

متن کامل

بررسی وضعیت و عوامل موثر بر چرخه مدیریت دانش از دیدگاه کتابداران دانشگاهی شهرستان ارومیه

Background and Aim: Knowledge management is effective in promoting organizational structure, level of services, and universities competency power. The present study was aimed to assess knowledge management effective factors including information technology, organization culture, human resources, and librarians' skills among university librarians in Urmia. Materials and Methods: This analytical ...

متن کامل

Evaluation of Project Critical Success Factors for Key Construction Players and Objectives

Critical Success Factors (CSFs) are used to support and evaluate the success of a strategic and tactical approach in project implementation in order to increase the probability of success. This system is used by executors in project delivery to achieve improved performance capabilities with limited resources. The present paper aims to identify the impact of CSFs amongst the main elements involv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001