The DONS rail scheduling system

نویسنده

  • Hee M. Voorhoeve
چکیده

This paper describes a system for automated rail scheduling currently being developed at Dutch Rail (NS). This system will be used initially to base infrastructure decisions upon. Rail infrastructure poses constraints upon the rail schedules that can be made within it, because of the large extent in which trains share it. Good infrastructure is the one that allows good schedules. The Petri net based ExSpect editor is used to model infrastructure variants and to help converting them into schedule constraints. With OR techniques, schedules are then made generated. ExSpect is then used to simulate the execution of these schedules within their infrastructure. Acknowledgements The authors are indebted to prof. Bertrand (EUT) and dr. Smeets (NS) for initiating and to all DONS team members from NS and BMC for maintaining an interesting cooperation. Most of the ideas within the present paper result from team work; we do not claim credit for them.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

FUZZY TRAIN ENERGY CONSUMPTION MINIMIZATION MODEL AND ALGORITHM

Train energy saving problem investigates how to control train's velocity such that the quantity of energy consumption is minimized and some system constraints are satis ed. On the assumption that the train's weights on different links are estimated by fuzzy variables when making the train scheduling strategy, we study the fuzzy train energy saving problem. First, we propose a fuzzy energy ...

متن کامل

Dynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness

This paper aims to develop a multi-objective model for scheduling cargo trains faced by the costs of tardiness and earliness, time limitations, queue priority and limited station lines. Based upon the Islamic Republic of Iran Railway Corporation (IRIRC) regulations, passenger trains enjoy priority over other trains for departure. Therefore, the timetable of cargo trains must be determined based...

متن کامل

Integration of Stockyard and Rail Network: a Scheduling Case Study

We investigate the integration of scheduling for a rail system and some of the operations in a coal terminal system, based on representative data. The rail and terminal systems are tightly-coupled and experience a high service demand from the expensive infrastructure. This makes efficient operations essential. However no central authority is in a position to effectively create global schedules ...

متن کامل

Concurrent Locomotive Assignment and Freight Train Scheduling

The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotiv...

متن کامل

The Scheduling of Rail at Union Pacific Railroad

The Union Pacific Railroad (UPRR) has over 3 1,000 miles of track covering a 24 state region. Planning and scheduling the production, packaging, delivery, and pickup of rail, involved in the maintenance of this network, is a very complex task. Manually scheduling only a subset of the resources required has historically taken several days to accomplish. Moreover, the inability to fully schedule ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005