Process and project alignment methodology: A case-study based analysis

نویسندگان

  • Paula Ventura Martins
  • Alberto Rodrigues da Silva
چکیده

Process descriptions represent high-level plans and do not contain information necessary for concrete software development projects. Processes that are unrelated to daily practices or that are hardly mapped to project practices, cause misalignments between processes and projects. We argue that software processes should emerge and evolve collaboratively within an organization. With this propose, this article describes the ProPAM methodology and explores the details of its static view. We also present a case study to validate effectiveness of the proposed methodology. The aim of the case study was to analyse the effects of using ProPAM in a IT organization.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Resilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)

Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

A Fuzzy Approach for Projects Evaluation and Selection an Iranian Auto Manufacturer Case Study

Evaluating and selecting alternatives investment projects needs considering all relevant and important aspects. In traditional methods, the focus is just on tangible monetary criteria. Also in the traditional methods, either all the information’s about factors must be known precisely or sufficient objective data must be available for applying probability theory. In this paper, a combinative app...

متن کامل

Studying the Morphologic Maturation of Aeolian Sand Grains During Transportation Process of Wind Erosion (Case study: Khartouran Erg)

Wind, in the duration of its erosional process, affects considerable changes in a grain's morphologyfrom its removal (detachment) step to sedimentation. In other word, a grain undergoes its gradualevolution during the transit process. In this project, the maturation of Aeolian sand grains had beenstudied upon as based on texture maturity indicator which includes: sorting, mean size grain, round...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Comput. Sci. Inf. Syst.

دوره 13  شماره 

صفحات  -

تاریخ انتشار 2016