Scheduling modular projects on a bottleneck resource
نویسندگان
چکیده
In this paper, we model a research-and-development project as consisting of several modules, with each module containing one or more activities. We examine how to schedule the activities of such a project in order to maximize the expected profit when the activities have a probability of failure and when an activity’s failure can cause its module and thereby the overall project to fail. A module succeeds when at least one of its constituent activities is successfully executed. All activities are scheduled on a scarce resource that is modeled as a single machine. We describe various policy classes, establish the relations among them, develop exact algorithms to optimize over two different classes (one dynamic program and one branch-and-bound algorithm), and examine the computational performance of the algorithms on two randomly generated instance sets.
منابع مشابه
An Efficient Approach for Bottleneck Resource(s) Detection Problem in the Multi-objective Dynamic Job Shop Environments
Nowadays energy saving is one of the crucial aspects in decisions. One of the approaches in this case is efficient use of resources in the industrial systems. Studies in real manufacturing systems indicating that one or more machines may also act as the Bottleneck Resource/ Resources (BR). On the other hand according to the Theory of Constraints (TOC), the efficient use of resources in manufact...
متن کاملSolving the Dynamic Job Shop Scheduling Problem using Bottleneck and Intelligent Agents based on Genetic Algorithm
The problem of Dynamic Job Shop (DJS) scheduling is one of the most complex problems of machine scheduling. This problem is one of NP-Hard problems for solving which numerous heuristic and metaheuristic methods have so far been presented. Genetic Algorithms (GA) are one of these methods which are successfully applied to these problems. In these approaches, of course, better quality of solutions...
متن کاملResource leveling scheduling by an ant colony-based model
In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...
متن کاملA multi Agent System Based on Modified Shifting Bottleneck and Search Techniques for Job Shop Scheduling Problems
This paper presents a multi agent system for the job shop scheduling problems. The proposed system consists of initial scheduling agent, search agents, and schedule management agent. In initial scheduling agent, a modified Shifting Bottleneck is proposed. That is, an effective heuristic approach and can generate a good solution in a low computational effort. In search agents, a hybrid search ap...
متن کاملThe resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کاملAn Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones
Project scheduling Net present value We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- J. Scheduling
دوره 17 شماره
صفحات -
تاریخ انتشار 2014