A Prospective Radiological Risk Assessment for a Phosphate Industry Project

نویسنده

  • Salvador Allende
چکیده

The Santa Quitéria Project is the major Brazilian uranium mine project, nowadays. A peculiarity of this project is the association of uranium with phosphate and the mining and processing of both by two different enterprises. A private company will be responsible for the production of phosphoric acid and a state owned company will be responsible for the production of yellow cake. At full capacity, the facility will generate 10% of Brazil’s total annual phosphoric acid production and 1,500 tons of yellow cake per year. The processing by which phosphoric acid is produced generates phosphogypsum (PG) as a by-product. The ratio of phosphogypsum to phosphoric acid is around 5 to 1. After all the phosphate has been extracted and processed, it is expected that some 37 million tons of phosphogypsum with 13 Bq/g of Ra will be produced. A prospective generic assessment was carried out for evaluating the potential radioactive impact of this PG stack on the workers and surrounding inhabitants. Two hypothetical farmer scenarios were designed to estimate the potential dose out of the project boundary and over the stack piles, after the shutdown of the project. The annual exposure dose of workers was also evaluated. As a result, the potential public and worker doses exceeded the adopted level of doses of 1mSv.y and 6 mSv.y, respectively. The simulation spotlighted the importance of the rainfall erosion index, and consequently the stack shape for the environmental contamination. The importance of planning the decommissioning of the facility still in the planning phase of the project to give support for the feasibility studies was also highlighter. Although quite conservative, the prospective assessing of dose herein is useful to aware and guide the decision makers on information and data survey and taking avoiding action to protect the health, by changing the project in some way.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Risk Assessment of Investments with Fuzzy Efficiency Indicators for Oil and Gas Production Industry

In the process of investment decision making, next to financial indicators many other aspects of investment projects are increasingly often considered. This leads to the multi-criteria evaluation of a project. The advantage of multi-criteria methods is the ability to take into account all (not only financial) aspects of the attractiveness of an investment project. The selection of criteria of p...

متن کامل

Radiological risk assessment of use of phosphate fertilizers in soil

ABSTRACT Background: The radiological impact of the use of phosphate fertilizers in soil is due to the internal irradiation of the lung by the alpha particles, short lived radon-thoron progeny and the external irradiation of the body by gamma rays emitted from radionuclides in situ. This paper describes the results of gamma spectrometric measurements of the concentration ...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

An Integrated Risk-Based Technique for Project Plan Selection

  Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012