Managing the Competencies of Team Members in Design Projects through Multi-period Task Assignment

نویسندگان

  • Onanong Hlaoittinun
  • Eric Bonjour
  • Maryvonne Dulmet
چکیده

Product design projects involve multiple team members with various knowledge and competencies that have to evolve with time, due to rapid organizational, technological and marketing changes. Project managers require management methods to optimize the assignment of tasks to human resources according to their competency levels and the need for competency evolution. In this paper, we tackle this optimization problem in the context of multiple design projects and multiple periods. The model we propose seeks to minimize two function objectives: (i) minimize the supplementary salary cost due to the extended task duration when using under-competent employees and (ii) minimize the financial penalties when the competency goals have not been reached. This problem has been solved by means of a simulated annealing -based optimization algorithm.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Patterns of Social Intelligence and Leadership Style for Effective Virtual Project Management

This paper explores the relationship of social intelligence and leadership style for effective project management in projects with varying degrees of virtuality. In the present study, the author determines what leadership style is preferred in virtual projects and analyzes the differential effects of varying degrees of virtuality on social intelligence and leadership style. The author tests hyp...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

An Integrated Methodological Framework for Project Task Coordination and Team Organization in Concurrent Engineering

Complex products or projects with long development times always involve multiple disciplines and a great deal of effort. Especially in concurrent engineering, the design needs to simultaneously consider various downstream activities throughout the entire product life cycle. To accomplish this, tasks in the concurrent engineering environment generally involve multifunctional teams in which team ...

متن کامل

Automatic Generation of a Multi Agent System for Crisis Management by a Model Driven Approach

Considering the increasing occurrences of unexpected events and the need for pre-crisis planning in order to reduce risks and losses, modeling instant response environments is needed more than ever. Modeling may lead to more careful planning for crisis-response operations, such as team formation, task assignment, and doing the task by teams. A common challenge in this way is that the model shou...

متن کامل

Fast Distributed Multi-agent Plan Execution with Dynamic Task Assignment and Scheduling

An essential quality of a good partner is her responsiveness to other team members. Recent work in dynamic plan execution exhibits elements of this quality through the ability to adapt to the temporal uncertainties of others agents and the environment. However, a good teammate also has the ability to adapt on-the-fly through task assignment. We generalize the framework of dynamic execution to p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010