An Interactive Decomposition Algorithm for Two-Level Large Scale Linear Multiobjective Optimization Problems with Stochastic Parameters Using TOPSIS Method

نویسنده

  • Tarek H. M. Abou-El-Enien
چکیده

This paper extended TOPSIS (Technique for Order Preference by Similarity Ideal Solution) method for solving Two-Level Large Scale Linear Multiobjective Optimization Problems with Stochastic Parameters in the righthand side of the constraints (TL-LSLMOP-SP)rhs of block angular structure. In order to obtain a compromise ( satisfactory) solution to the (TL-LSLMOP-SP)rhs of block angular structure using the proposed TOPSIS method, a modified formulas for the distance function from the positive ideal solution (PIS ) and the distance function from the negative ideal solution (NIS) are proposed and modeled to include all the objective functions of the two levels. In every level, as the measure of ―Closeness‖ dp-metric is used, a k-dimensional objective space is reduced to two –dimentional objective space by a first-order compromise procedure. The membership functions of fuzzy set theory is used to represent the satisfaction level for both criteria. A single-objective programming problem is obtained by using the max-min operator for the second –order compromise operaion. A decomposition algorithm for generating a compromise ( satisfactory) solution through TOPSIS approach is provided where the first level decision maker (FLDM) is asked to specify the relative importance of the objectives. Finally, an illustrative numerical example is given to clarify the main results developed in the paper.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Compromise Decision-making Model based on TOPSIS and VIKOR for Solving Multi-objective Large-scale Programming Problems with a Block Angular Structure under Uncertainty

This paper proposes a compromise model, based on a new method, to solve the multi-objective large-scale linear programming (MOLSLP) problems with block angular structure involving fuzzy parameters. The problem involves fuzzy parameters in the objective functions and constraints. In this compromise programming method, two concepts are considered simultaneously. First of them is that the optimal ...

متن کامل

A Compromise Decision-Making Model Based on TOPSIS and VIKOR for Multi-Objective Large- Scale Nonlinear Programming Problems with A Block Angular Structure under Fuzzy Environment

This paper proposes a compromise model, based on a new method, to solve the multiobjectivelarge scale linear programming (MOLSLP) problems with block angular structureinvolving fuzzy parameters. The problem involves fuzzy parameters in the objectivefunctions and constraints. In this compromise programming method, two concepts areconsidered simultaneously. First of them is that the optimal alter...

متن کامل

A Compromise Decision-making Model for Multi-objective Large-scale Programming Problems with a Block Angular Structure under Uncertainty

This paper proposes a compromise model, based on the technique for order preference through similarity ideal solution (TOPSIS) methodology, to solve the multi-objective large-scale linear programming (MOLSLP) problems with block angular structure involving fuzzy parameters. The problem involves fuzzy parameters in the objective functions and constraints. This compromise programming method is ba...

متن کامل

An interactive algorithm for large scale multiple objective programming problems with fuzzy parameters through TOPSIS approach

In this paper, we extend TOPSIS (Technique for Order Preference by Similarity Ideal Solution) for solving Large Scale Multiple Objective Programming problems involving fuzzy parameters. These fuzzy parameters are characterized as fuzzy numbers. For such problems, the α-Pareto optimality is introduced by extending the ordinary Pareto optimality on the basis of the α-Level sets of fuzzy numbers. ...

متن کامل

Two-stage Stochastic Programing Based on the Accelerated Benders Decomposition for Designing Power Network Design under Uncertainty

In this paper, a comprehensive mathematical model for designing an electric power supply chain network via considering preventive maintenance under risk of network failures is proposed. The risk of capacity disruption of the distribution network is handled via using a two-stage stochastic programming as a framework for modeling the optimization problem. An applied method of planning for the net...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015